Strategic Bombers

B-1B Cost and Performance Remain Uncertain Gao ID: NSIAD-89-55 February 3, 1989

Pursuant to a congressional request, GAO provided information on the status of the: (1) major B-1B bomber systems; (2) test program; (3) current B-1B cost estimates; and (4) cost estimates for identified enhancements.

GAO found that the Air Force: (1) corrected some previously identified production and performance problems involving flight controls and terrain-following radar; (2) will require a $1 billion redesign of B-1B defensive avionics to achieve expected capabilities; (3) continued to progress well in its testing program, although it had not demonstrated full performance; (4) spent about $31 billion in escalated dollars for 100 B-1B aircraft, including about $3.7 billion for such non-baseline items as simulators and interim contractor support; (5) estimated that it needed $921 million in additional funding to complete the program; (6) believed that its final program cost would be very close to the established cost cap of $20.5 billion; (7) estimated that potential enhancements to the B-1B aircraft could exceed $7 billion; (8) did not accurately detail the current cost, schedule, and performance status of the B-1B program in its most recent selected acquisition report to Congress; and (9) must address several important technical questions regarding defense avionics corrections, flight control improvements, cruise missile carrier effectiveness, and multipurpose bomber potential before it can determine final program costs.



The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.