Maximizing DOD's Untapped Potential to Improve Business Performance
Gao ID: GAO-10-184CG October 14, 2009
This speech was given by the Acting Comptroller General before the Department of Defense Performance Breakthrough Convention in Lansdowne, Virginia on October 14, 2009. As is the case for other federal agencies, the Nation's fiscal situation has significant implications for DOD. Specifically, the Department faces competing demands for resources and a number of internal fiscal pressures as it tries to support ongoing operations, rebuild readiness, and prepare for the future. While these circumstances are challenging, they also underscore the need for constructive change.
Given the reality of growing federal budgetary constraints, it is essential that DOD become more efficient and put its resources to better use. Clearly, DOD is unique among federal agencies due to its size and budget as well as the complexity of its organizational structure and mission. Not only does its budget represent a little over half of the entire federal government's discretionary spending, the level of resources provided to the Department has increased significantly over time. For fiscal year 2009, Congress provided about $664 billion for DOD, including about $513 billion for base needs and about $151 billion for contingency operations. And, since 2001, DOD has received a total of about $893 billion to support contingency operations, including military operations in Iraq, Afghanistan, and elsewhere around the world. Notwithstanding the external pressures, DOD faces its own near-term and long-term internal fiscal pressures as it attempts to balance competing demands from within. Let me touch on a few areas we have highlighted for the Congress and the new administration. First, ongoing operations will continue to require substantial amounts of resources. Second, extended military operations have taken a toll on readiness and rebuilding the force will undoubtedly have a big price tag. Third, personnel and health care costs are increasing. Fourth, cost growth in weapon systems programs remains a significant problem. Now let me turn to a few key examples of where DOD can tap its potential to improve business operations, save money, and optimize support to the warfighter: (1) weapon systems acquisition management; (2) inventory management; (3) contract management; and (4) financial management. In so many areas, DOD has the ability to achieve tangible and sustainable outcomes that will ultimately provide better support to the war fighter. Success will require strong leadership that sets the tone, takes decisive action, and assumes accountability for results. Success will also depend on sound plans that set clear priorities and measurable goals as well as results-oriented performance measures that can be used to gauge progress and make adjustments. Truly, DOD will need to approach the transformation of its business operations with the same level of intensity as it plans and carries out its military operations.
GAO-10-184CG, Maximizing DOD's Untapped Potential to Improve Business Performance
This is the accessible text file for Acting Comptroller General speech
number GAO-10-184CG entitled 'Maximizing DOD's Untapped Potential to
Improve Business Performance' which was released on October 22, 2009.
This text file was formatted by the U.S. Government Accountability
Office (GAO) to be accessible to users with visual impairments, as part
of a longer term project to improve GAO products' accessibility. Every
attempt has been made to maintain the structural and data integrity of
the original printed product. Accessibility features, such as text
descriptions of tables, consecutively numbered footnotes placed at the
end of the file, and the text of agency comment letters, are provided
but may not exactly duplicate the presentation or format of the printed
version. The portable document format (PDF) file is an exact electronic
replica of the printed version. We welcome your feedback. Please E-mail
your comments regarding the contents or accessibility features of this
document to Webmaster@gao.gov.
This is a work of the U.S. government and is not subject to copyright
protection in the United States. It may be reproduced and distributed
in its entirety without further permission from GAO. Because this work
may contain copyrighted images or other material, permission from the
copyright holder may be necessary if you wish to reproduce this
material separately.
Maximizing DOD's Untapped Potential to Improve Business Performance:
DOD Performance Breakthrough Convention:
Lansdowne, VA:
October 14, 2009:
Gene L. Dodaro,
Acting Comptroller General of the United States:
It is a pleasure to be here today to discuss business operations at the
Department of Defense (DOD). The Deputy Secretary and other conference
organizers are to be commended for bringing together senior leaders
from inside and outside DOD. Collaboration and partnering are central
enablers. We have worked hard to incorporate these principles into
daily practice at GAO.
I recognize that business practices at DOD are not going to change
overnight. But this conference can help this process by encouraging an
exchange of ideas. By sharing professional experiences and expertise,
everyone here has an opportunity to enrich DOD's knowledge base and
help build the Department's capacity to develop new solutions to old
problems. Your presence here today is evidence of the defense
workforce's strong work ethic and commitment to its mission. These
basic DOD values, combined with strong leadership and follow-through,
can achieve huge improvement in business practices because there is a
lot of untapped potential at DOD to get better results and the best
support to the warfighter.
As I looked over the conference materials, the goals set forth for DOD
are laudable. Those goals are to:
--demonstrate support for the President's directive to improve business
operations;
--showcase success stories about enterprise-wide performance
improvement; and:
--establish an ongoing review process to solve enterprise-wide
challenges.
These goals recognize the shared opportunities and responsibilities to
address longstanding weaknesses in DOD business operations and achieve
measurable and sustainable results. Identifying the challenges is the
easy part, as those of you who navigate DOD's business processes on a
daily basis know all too well. The hard part is identifying solutions,
taking action, sustaining progress, and maintaining momentum.
As is the case for other federal agencies, the Nation's fiscal
situation has significant implications for DOD. Specifically, the
Department faces competing demands for resources and a number of
internal fiscal pressures as it tries to support ongoing operations,
rebuild readiness, and prepare for the future. While these
circumstances are challenging, they also underscore the need for
constructive change.
This afternoon, I will discuss how DOD can leverage this opportunity to
encourage business transformation. My intent is to stimulate your
thinking and encourage decisive actions to help DOD operate more
efficiently and effectively. I expect that the presentations you will
hear over the next few days will describe projects that have already
improved business performance. My hope is that those presentations may
also be an impetus for future change.
Fiscal Challenges Facing the Nation and DOD:
No one and no organization is immune from America's fiscal challenges.
That includes DOD. Given the reality of growing federal budgetary
constraints, it is essential that DOD become more efficient and put its
resources to better use.
It is important to have a perspective about our government's fiscal
challenges before talking about the fiscal pressures facing DOD.
Weaknesses in the economy and financial markets--and the government's
response to them--have contributed to an increase in the federal
deficit and debt. As shown in the table below, the fiscal year 2009
deficit reached a record $1.4 trillion and the debt held by the public
exceeded 50 percent of GDP.
Figure 1: Deficits, Debt Held by the Public and Debt Subject to Limit:
[Refer to PDF for image: table]
Source: GAO.
[End of figure]
While a lot of attention has been given to the government's current
fiscal situation, the government faces even larger financing challenges
that will persist long after the economy recovers and the financial
markets stabilize. As this graph shows, recent GAO simulations indicate
that federal debt held by the public will increase dramatically over
the next several decades and could trend towards 200 percent of GDP. In
the Baseline Extended simulation, which reflects current law through
2019 and then holds revenue and spending other than major entitlement
programs constant as a share of GDP, discretionary spending is lower as
a share of the economy, and revenues are higher than the 20-year
historical average. In the Alternative simulation, which reflects
historical trends and policy preferences, both discretionary spending
and revenue as a share of the economy are nearly at the historical
averages. Let me put this into perspective. Under one scenario, in a
little over 10 years, debt held by the public as a share of GDP could
exceed the historical high reached in the aftermath of World War II.
Figure 2: Debt Held by the Public As a Share of GDP Under Two Different
Fiscal Policy Simulations:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
These debt levels reflect the cumulative effect of growing deficits.
While the timing of deficits and the resulting debt buildup varies
depending on the assumptions used, both simulations show that the
federal government is on an unsustainable path.
Figure 3: Federal Budget Surpluses and Deficits Under Different Fiscal
Policy Situations:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
What drives this outlook? Primarily rising health care costs and an
aging population. Assuming no changes in Medicare, Medicaid or Social
Security, spending on those programs and interest on the federal debt
will account for an ever-growing share of the economy, which will in
turn affect the availability of resources for discretionary spending.
If revenue remains near the historical average of about 18 percent for
the next few decades, which is depicted by the line in the graph below,
every federal agency, including DOD, will be subject to tighter budgets
as discretionary spending is squeezed.
Figure 4: Potential Fiscal Outcomes Under GAO's Alternative Simulation:
Revenues and Composition of Spending:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
Clearly, DOD is unique among federal agencies due to its size and
budget as well as the complexity of its organizational structure and
mission. Not only does its budget represent a little over half of the
entire federal government's discretionary spending, the level of
resources provided to the Department has increased significantly over
time, as the following graph shows. For fiscal year 2009, Congress
provided about $664 billion for DOD, including about $513 billion for
base needs and about $151 billion for contingency operations. And,
since 2001, DOD has received a total of about $893 billion to support
contingency operations, including military operations in Iraq,
Afghanistan, and elsewhere around the world.
Figure 5: DOD Budget Authority FY 2001-2009 (Excluding Contingency
Operations):
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
Notwithstanding the external pressures, DOD faces its own near-term and
long-term internal fiscal pressures as it attempts to balance competing
demands from within. Let me touch on a few areas we have highlighted
for the Congress and the new administration.
--First, ongoing operations will continue to require substantial
amounts of resources. The magnitude of costs for operations in both
Iraq and Afghanistan will depend on several factors and, in some cases,
assumptions and decisions that have not yet been made. For example,
costs will be influenced by how the U.S.-Iraq security agreement and
associated troop redeployment plans are implemented, the nature and
extent of continued U.S. military and civilian presence in Iraq as well
as decisions on the size of the force to be deployed to Afghanistan,
the types of facilities needed to support troops remaining in and
around Iraq, the amount of equipment to be repaired or replaced, as
well as health care needs of returning service members. Although
drawing down troop levels may on its surface appear to lower costs, GAO
has seen from previous operations in the Balkans and Kosovo that costs
could rise in the near term because of the cost variables I just
mentioned.
--Extended military operations have taken a toll on readiness and
rebuilding the force will undoubtedly have a big price tag. Since 9/11,
U.S. forces have operated at a high pace and gained considerable combat
experience. But this high operational tempo has significantly affected
the readiness of the force, especially in the Army and Marine Corps.
Personnel are deploying frequently and have little time to train for
anything other than counterinsurgency missions. Equipment is used
repeatedly, causing wear and tear. Units that are not deployed are
transferring equipment and personnel to deploying units, causing some
shortfalls. Also, the Air Force and the Navy are facing challenges in
maintaining aging aircraft and ships. Rebuilding readiness is a complex
and costly effort, but it will be even more challenging because, at the
same time, DOD is pursuing broad-based initiatives to grow, modernize,
and transform its forces and capabilities.
--Personnel and health care costs are increasing. DOD's military
personnel outlays have risen significantly since fiscal year 2000,
fueled in part by increases in basic pay, housing allowances,
recruitment and retention bonuses, incentive pays and allowances, and
other special pays. In addition, a large portion of DOD's compensation-
related costs is in the form of benefits and deferred compensation, and
DOD's costs to provide benefits such as health care have continued to
spiral upward. Expanded health care to reservists, their families, and
retirees has been the primary cost driver in growing benefits costs.
--Cost growth in weapon systems programs remains a significant problem.
In fact, total acquisition cost growth on DOD's fiscal year 2008
portfolio of major programs has reached nearly $300 billion over
initial estimates. DOD's ability to successfully adapt to budgetary
constraints will depend in great measure on its ability to better
manage weapon systems acquisition. This is a long-standing challenge at
DOD. Back in 1990, GAO first designated DOD's management of major
weapon systems acquisitions as a high-risk area. The bottom line is
that programs continue to take longer, cost more, and deliver fewer
quantities and capabilities than originally planned. Why does this
occur? It's because at the program level, programs are initiated
without enough knowledge about system requirements, technology and
design maturity. Lacking such knowledge, managers rely on assumptions
that are consistently too optimistic, exposing programs to significant
and unnecessary risk, and ultimately cost growth and delays. Cost
overruns lead to fewer resources for other priorities and reduced
buying power for DOD, and schedule delays mean that the warfighter does
not get critical capabilities when needed and therefore relies on
legacy systems or goes without. While I will touch on this later, I do
want to say that recent statements and actions of the President,
Congress, and the Secretary of Defense to bring greater attention to
acquisition reform are encouraging.
Targets of Opportunities for Reform:
Given the rising pressures on the federal budget in both the short and
long term as well as the internal fiscal pressures DOD faces, it can no
longer afford to conduct business as usual. DOD has a proven track
record in maintaining a highly capable warfighting force, but has not
achieved the same level of effectiveness on its business side. For more
than a decade, DOD has dominated GAO's list of federal programs and
operations that we consider to be high-risk and vulnerable to fraud,
waste, abuse, and mismanagement. In fact, all the DOD programs on the
high-risk list relate to business operations that support the
warfighter, including systems and processes related to management of
contracts, finances, the supply chain, and support infrastructure, in
addition to weapon systems acquisition. Inefficiencies and other
longstanding weaknesses in these areas lead to challenges in supporting
the warfighter, billions of dollars being wasted annually, and missed
opportunities to free up resources for higher priority needs.
Clearly, DOD's size and complexity contribute to the challenges it
faces in improving business performance. To the Department's credit, we
have seen greater top management emphasis on reform in the past several
years as well as measurable progress in some areas. It is obvious that
this progress would not have been possible without the significant time
and efforts of a highly competent, hardworking and dedicated defense
workforce, including those of you who are here today.
While a change in administration requires concerted efforts from all
levels to sustain momentum from the past, it also offers new
opportunities for change. In this context, we see positive indicators
that suggest the environment is conducive for DOD to make great
strides. For example:
* President Obama has emphasized, publicly and in directives, that the
federal government needs to be more transparent and that contracting
reforms are needed across the federal agencies;
* Secretary Gates, in developing DOD's fiscal year 2010 budget
submission, initiated decisions to adjust or terminate programs which
indicated a willingness to reevaluate programs and make the hard
decisions to eliminate or take other corrective action on those that
are not performing well;
* In December 2008, DOD revised its acquisition policy in ways that
could, if implemented properly, provide a foundation for developing
individual acquisition programs with sound, knowledge-based business
cases. This revision establishes early milestone reviews, requires
completion of key systems engineering activities and competitive
prototyping, and emphasizes preliminary design reviews prior to program
initiation; and:
* Also, the Congress enacted the Weapon System Acquisition Reform Act
of 2009 to add further discipline and accountability to the acquisition
system. This legislation contains several requirements, including that
DOD develop mechanisms to consider trade-offs among cost, schedule, and
performance in establishing program requirements and to certify that
trade-offs have been made.
DOD can capitalize on this renewed emphasis on achieving greater fiscal
discipline, accountability and effectiveness, and take decisive action
to produce results in the near-term. Before discussing specific targets
of opportunity, let me highlight some key elements that must be present
to achieve near-term results.
It will clearly take sustained and focused top-level leadership and
sound plans to guide transformation efforts. For the first time, DOD
has a Chief Management Office position, established in law as part of
the Deputy Secretary of Defense's responsibilities. As the Chief
Management Officer, the Deputy Secretary is responsible, with
assistance from the Deputy Chief Management Officer, for developing a
strategic management plan for business operations, and integrating
efforts to transform business operations. And the military departments
are also statutorily required to have chief management officers,
business transformation offices, and business transformation plans. At
this point, DOD has taken some positive steps to institutionalize these
positions and organizations, but in some cases, decision-making
authority and relationships are not yet well defined.
But just creating positions and offices is not enough; success will
depend on how effectively the department and the military departments
can institutionalize these positions and organizations. This would
include defining and clarifying the respective authorities, roles, and
responsibilities. To do so will afford senior leaders, and those
responsible for implementation such as you, the authority and means to
become advocates for transformational change.
Getting leaders and organizations in place and developing sound plans
is a good start. But to achieve real reform, the Department needs to
set priorities, strengthen management accountability, execute its
plans, gauge actual progress against goals, and make adjustments as
needed. As part of GAO's broad body of defense related work, we have
routinely seen that there is a lack of focus on developing and using
interim performance measures to measure progress and the impact of
actions taken. Everyone here has most likely seen many DOD improvement
initiatives, often great in concept, fail or fall to the wayside due to
a lack of sustained focus. Transformation initiatives need to be set
forth into measurable steps toward a long-term goal, and then interim
measures used to gauge progress and adjust strategy if needed. This
approach is key to solving many of these long-standing problems.
Now let me turn to a few key examples of where DOD can tap its
potential to improve business operations, save money, and optimize
support to the warfighter.
Weapon systems acquisition management:
Probably one of the best examples of where DOD could make real progress
in the near-term is in improving its approach to acquiring major weapon
systems. Since 2003, DOD's portfolio of major defense acquisition
programs has grown from 77 to 96 programs; and its investment in those
programs has grown from $1.2 trillion to $1.6 trillion (fiscal year
2009 dollars).[Footnote 1] The chart below depicts the change in the
size and performance of DOD's portfolios of major acquisition programs.
Figure 6: Analysis of DOD Major Defense Acquisition Program Portfolios:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
And, as the graph below shows, over 40 percent of all the major
programs in DOD's fiscal year 2008 portfolio are about 25 percent over
budget compared to initial estimates.
Figure 7: DOD Cost Outcomes:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
To add to the challenges, the average delay in delivering initial
capabilities in DOD's portfolio of weapon systems programs has
increased over time to 22 months, as shown in the graph below. DOD's
performance in some of these areas is driven by older programs, as
newer programs, on average, have not shown the same degree of cost and
schedule growth.
Figure 8: DOD Program Schedule Outcome:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
Over the next 5 years, DOD expects to invest more than $357 billion on
major defense acquisition programs. To put the size of this figure in
context, that is close to half of what Congress has provided to support
overseas contingency operations over the past 8 years. Much of this
investment will be used to address cost overruns due to shortcomings in
planning, execution, and oversight. These types of problems have
plagued DOD's weapon systems portfolio for the past 30 years. We see
these problems as being at odds with the very capable and dedicated
people we deal with frequently in the program offices and other key
organizations. So, why aren't good people getting better outcomes? We
have come to see recurrent problems as not due primarily to mistakes,
lack of expertise, or unforeseeable events. Rather we see them as an
outgrowth of a system in which key processes and incentives are better
at saying "yes" than "no" to programs that do not measure up. The
challenge is to change the dynamics of this culture.
Because of the magnitude of the investment and the current fiscal
environment, DOD can no longer afford to let cost growth go unchecked
and programs inch towards completion. On a positive note, Secretary
Gates has identified the need for weapon systems acquisition reform as
chief among DOD's institutional challenges. DOD is off to a good start.
Last December, DOD made major revisions to its acquisition policies,
which address many of the problems that can be traced back to the
acquisition system. The revisions, which are in line with our past
recommendations, aim to provide key department leaders with the
knowledge needed to make informed decisions before a program starts and
to maintain discipline once it begins. To improve outcomes on the
whole, though, DOD must ensure that these policy changes are
immediately and consistently put into practice and reflected in
decisions made on individual acquisitions. It must also clearly assign
accountability to an individual or individuals for its implementation.
Additionally, Secretary Gates has identified programs that should
either be adjusted or terminated, based in large part on their
performance, cost-effectiveness, and ultimate value to the war fighter,
which is an encouraging sign of change. However, process reforms,
funding cuts, and cancellations are not enough to change the culture.
Mission-essential programs with executable strategies, regarding the
technology, design, test, and overall cost, must win the budget
battles. Tough choices will need to be made about specific weapon
systems, and stakeholders--from the military services to industry to
the Congress--will have to play a constructive role in this process.
On a positive note, we have seen progress on new programs. For example,
since 2006, programs entering system development have done so with
higher levels of technology maturity--a key indicator of program
success. Additionally, we found in our last comprehensive review of 47
DOD's major acquisition programs that there were a few modest
indications of improvement within the portfolio from 2007 to 2008, such
as the fact that the total percentage of programs with 25 percent or
more increases in program unit costs decreased by a few percentage
points.
DOD still has work to do in this area, and there are ample
opportunities for reform and improvement that can yield tangible
results in the near-term and free up resources. From that standpoint,
DOD needs to continue to review existing and planned programs to:
* determine the right mix of programs to invest in by making better
decisions as to which programs should be pursued or not pursued given
evolving mission needs and both existing and expected funding,
* ensure that programs are executable by matching requirements with
resources and locking in those requirements, and:
* make it clear that programs will then be executed based on actual
knowledge and mature technology, and not assumptions that are often
overly optimistic, and that program managers and senior leaders will be
held responsible for that execution.
Inventory management:
Improving DOD's approach to inventory management is an opportunity for
reform that could yield significant savings now and free up resources
for other priorities. For example, DOD officials have estimated that
the level of investment in the department's supply chains is more than
$150 billion a year, and the value of its spare part inventories has
grown by tens of billions of dollars in recent years. Yet, the
department continues to have substantial amounts of secondary inventory
that are in excess to requirements. For example, in our last review of
the Air Force's inventory, we reported that more than half of its
secondary inventory, valued at about $31 billion, was not needed to
support required inventory levels from 2002 through 2005.
More recently, in our review of the Navy's secondary inventory, we
found that, on average for fiscal years 2004 through 2007, about $11
billion, or around 60 percent, of the total annual inventory value of
$18.7 billion was needed to meet current requirements, but $7.5
billion, or about 40 percent, exceeded current requirements. The graph
below shows, by fiscal year, the dollar amount of inventory that met
and exceeded current requirements.
Figure 9: Navy Secondary Inventory Meeting and Exceeding Current
Requirements (Fiscal Years 2004-2007):
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
The Army is also retaining too much inventory that is not needed to
meet requirements. Our review of the Army's secondary inventory showed
that, on average, about $12.7 billion, or about 78 percent, of the
total annual inventory value of $16.3 billion was needed to meet
current requirements, whereas $3.6 billion, or around 22 percent,
exceeded current requirements.[Footnote 2] Similar to the Navy, the
graph below illustrates that the trend of retaining excess inventory
has remained stable from fiscal years 2004 through 2007.
Figure 10: Army Secondary Inventory Meeting and Exceeding Current
Requirements, (Fiscal Years 2004-2007):
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
A major cause for the accumulation in excess inventories is weaknesses
in the military services' approach to forecasting demand as well as a
lack of metrics and targets focusing on the cost efficiency of
inventory management. More effective processes that identify and manage
acquisition lead times are of critical importance to maintaining cost-
effective inventories, budgeting, and having materiel available when it
is needed. Overestimates and underestimates of acquisition lead time
contribute to inefficient use of funds and potential shortages or
excesses of spare parts.
The Department can strengthen the accountability and management of its
secondary inventory. For example, we have recommended that the services
evaluate why they experience decreases in demand for supplies, which
contribute to having excess inventories; determine what actions are
needed to better forecast demand; and take steps to implement these
actions. Furthermore, we have made recommendations to develop
performance goals and metrics to assess and track the cost efficiency
of the services' inventory management practices and to provide for a
greater oversight role to the service chief management officers for
improving inventory management. We have also recommended changes in
inventory management policies and practices that contribute to excess
inventories. Lastly, DOD needs to implement effective processes to
identify/manage acquisition lead times in order to maintain cost-
effective inventories, budget wisely, and have materiel available when
needed. Taking steps such as these to transform the way in which DOD
manages its supply chain and inventory supplies will result in better
mission-essential support to the warfighter and will free up resources
wasted or tied up in unneeded spare parts for higher priority needs.
DOD has generally concurred with our recommended actions and has taken
some steps to improve inventory management. For example, the Air Force
has made some needed policy changes, and the Army has directed that
more up-to-date operational information be provided to inventory
managers so they can make more informed purchase decisions.
Furthermore, we understand that the Office of the Secretary of Defense
has initiated a study to develop options for improving demand
forecasting of spare parts.
Recently, the Congress has also shown increased interest in reforming
DOD's inventory management practices. For example, the House, as part
of its report accompanying the fiscal year 2010 National Defense
Authorization Act, suggests actions that DOD can take to improve the
ways in which it forecasts demands for spare parts. Similarly, the
conference report accompanying the Act would require DOD to submit a
comprehensive plan for improving its overall inventory management
practices, from improving demand forecasting to reducing current excess
inventory stocks.
Contract management:
DOD's management of contracts for goods and services, and the use of
contractors in general, is another area that needs greater scrutiny and
offers potential for saving money. Unfortunately, DOD's contracts have
not always led to the desired outcomes and it is not always clear that
DOD has been using sound business practices to acquire goods and
services. On a positive note, the Secretary of Defense and other senior
leaders have acknowledged these weaknesses and the need for reform,
which has begun to prompt action within the Department.
Taking deliberate action now is critical because DOD has become reliant
on contractors to meet critical missions, including those related to
ongoing operations, and to support acquisition functions. For example,
DOD reported that, as of the second quarter of 2009, over 200,000
contractor personnel were working in Iraq and Afghanistan.[Footnote 3]
To put the level of contracting activity into perspective, between
fiscal years 2001 and 2008, DOD obligations on contracts when measured
in real terms have more than doubled to over $387 billion in total, and
to more than $200 billion just for services. At the same time, DOD's
acquisition workforce, responsible for contract management, has not
similarly grown. In fact, during that same time period, DOD's
contracting career field grew by only about 1 percent. The graph below
clearly illustrates the problem--that the size of the contracting
workforce has not kept pace with level of contracting activity.
Figure 10: Changes in DOD's Contract Obligations and Contracting
Workforce, Fiscal Years 2001 through 2008:
[Refer to PDF for image: chart]
Source: GAO.
[End of figure]
To its credit, DOD has issued guidance to address contracting
weaknesses and encourage the use of sound business arrangements. For
example, consistent with congressional direction and GAO's
recommendations, DOD established a process for reviewing major services
acquisitions; issued regulations to better manage its use of
contracting arrangements that can pose additional risks for the
government, including time-and-materials contracts and undefinitized
contracting actions; and has efforts under way to identify and improve
the skills and capabilities of its workforce. For example, in November
2008 we reported that DOD has been developing, revising, and finalizing
new joint policies and guidance on the department's use of contractors
to support deployed forces and has begun developing training programs
for personnel that do not work in the acquisition field to provide
information necessary to operate effectively on contingency contracting
matters and work with contractors on the battlefield.[Footnote 4]
However, there is still much work to be done. We have recommended that
DOD needs to (1) assess the risks that its increasing reliance on
contractors poses, (2) determine the appropriate mix of contractor,
civilian, and military personnel in shaping its total force for the
future, including the role and use of contractors to support deployed
forces, and (3) ensure that it maintains an acquisition workforce that
is adequately sized, trained, and equipped, so that it can effectively
plan, negotiate, award, and manage the range of contracts needed to
meet the department's needs.[Footnote 5] In addition, because DOD has
paid billions in award and incentive fees to contractors regardless of
acquisition outcomes, we have also recommended ways that DOD can
continue to strengthen the link between contractor monetary incentives,
such as award and incentive fees, and acquisition outcomes, which has
started to show positive returns. Lastly, DOD should continue to focus
attention on higher risk contracting strategies, such as the use of
time-and-materials contracts and undefinitized contract actions, to
ensure effective management of these approaches. Such efforts would
also be consistent with recent direction from the Administration to
reduce the use of high risk contracting strategies.
These critical contracting reforms, if successfully implemented, will
improve the credibility of DOD's contracting processes. This will not
only help ensure that desired outcomes are achieved, but will also
enhance the return on the significant investments of taxpayer dollars
for the contracting of goods and services.
Financial management:
Last but certainly not least, DOD must have reliable financial
information. While DOD represents a big share of the federal budget, it
is one of the few federal entities that cannot accurately account for
its spending or assets. It is one of only 3 entities in the entire
government that cannot pass the test of an independent audit. Without
accurate financial information, DOD is severely hampered in its ability
to make sound budgetary and programmatic decisions, monitor trends,
make adjustments to improve performance, or maximize the use of
resources.
Since the first financial statement audit was attempted at DOD nearly
20 years ago, GAO has consistently called for actions to address
weaknesses in DOD financial management.[Footnote 6] DOD has launched
several reform efforts over the years, but these have met with little
success. Continued financial management and related deficiencies hinder
DOD's ability to control costs, ensure basic accountability, anticipate
future costs and claims on the budget, measure performance, and
maintain control over funds. Problems with asset accountability further
complicate critical functions, such as supporting the current plans to
withdraw troops and equipment from Iraq.
DOD's new comptroller hopes to increase the program's chances for
success by improving budgetary information and asset accountability. As
shown below, the emphasis will be on two areas. First, strengthening
information and processes supporting the Department's Statements of
Budgetary Resources. Second, verifying the existence and completeness
of mission critical assets, from weapons systems to real property to
general equipment.
Figure 11: Current Focus on DOD's Financial Management Efforts:
[Refer to PDF for image: slide]
Source: GAO.
[End of figure]
Budgetary and asset-accountability information is widely used by DOD
managers at all levels, so its reliability is vital to daily operations
and management. The Marine Corps has just begun an audit of its fiscal
year 2010 Statement of Budgetary Resources, and DOD is treating this as
a test case. If the Marine Corps audit is successful, it will be used
as a model for the other services.
We and the comptroller agree that DOD's current financial management
priorities are necessary and critical to improving accountability and
information for operations. When it comes to assets, DOD certainly
needs to provide accountability over the existence and completeness of
those items. GAO believes it may be worthwhile to revisit the question
of how DOD reports assets in its financial statements because the
traditional financial reporting model was not designed to address the
unique aspects of military assets.
DOD components are developing detailed plans to support efforts to
improve financial management in budgetary reporting and related
operational processes and accountability for asset existence and
completion. Based on what we have seen of the plan so far, we believe
this prioritization is a reasonable approach for now. A consistent
focus may increase the Department's ability to show incremental
progress toward achieving auditability in the short term. In response
to GAO's recommendations, the department has also put in place a
process to improve standardization and comparability across components.
The success of this process will depend on top management support, as
well as high-quality planning and effective implementation at all
levels.
Overall, we are encouraged by DOD's renewed attempt to improve its
financial management and achieve accountability for its expenses and
assets. GAO will continue to monitor progress and provide feedback on
the status of those efforts. Among other things, we will seek to
determine the reasonableness of efforts to achieve stated objectives
and identify any gaps in strategic planning and coordination among the
components. We will also track the progress of DOD's remediation plans
for the remaining financial management areas. At some point down the
road, I expect GAO and others will become involved in discussions about
how DOD should be recording assets for financial statement purposes.
I should stress that financial management improvement efforts are also
pivotal to achieving broader business transformation goals. Accurate,
timely, and useful financial management information is essential for
sound management analysis, decision making, and reporting.
Concluding Remarks:
In closing, I want to reiterate that DOD has a real opportunity in the
days ahead to set a new course for the future, take concrete steps to
correct longstanding problems, and achieve meaningful results that can
materially improve business performance. Given our nation's growing
fiscal and other challenges, the Department cannot afford to delay
addressing inefficiencies in its business operations and free up
resources for higher priorities. The old ways of doing business,
without regard to cost or outcome, are truly unsustainable.
In so many areas, DOD has the ability to achieve tangible and
sustainable outcomes that will ultimately provide better support to the
war fighter. Success will require strong leadership that sets the tone,
takes decisive action, and assumes accountability for results. Success
will also depend on sound plans that set clear priorities and
measurable goals as well as results-oriented performance measures that
can be used to gauge progress and make adjustments. Truly, DOD will
need to approach the transformation of its business operations with the
same level of intensity as it plans and carries out its military
operations.
And while focused senior-leadership and clear planning are vital,
success in transforming DOD's business operations is not possible
without managers such as you who are willing to rethink the status quo,
identify opportunities for reform, and actively push for change.
Without you, transformation is just talk. There are countless ways that
each of you, as members of a talented and experienced workforce, can
make a real difference in how DOD does business.
The examples of reform that I have discussed today are really just the
beginning. The reality is there are vast untapped opportunities to
increase efficiency, improve effectiveness, reduce waste, and achieve
perhaps the most important goal--to support the men and women who serve
our country through the prudent and wise use of taxpayer dollars.
As I said at the outset, you face a difficult set of challenges, some
of which are long-standing and some of which are new. When we consider
these challenges together with the recent direction set by the
President, the Congress, and the Secretary of Defense, it is clear that
we are at a critical juncture, one that requires thoughtful but
decisive action. Opportunities like this come around. The problems have
been identified and fully debated. Now it is time to let the solutions
dominate the discussion.
It has been a pleasure to be here today. We at GAO look forward to
continuing to work with the Department on these important issues.
[End of section]
Footnotes:
[1] GAO, Defense Acquisitions: Assessments of Selected Weapon Programs,
[hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-09-326SP]
(Washington, D.C.: Mar. 30, 2009.
[2] Our analysis included secondary inventory from the U.S. Army
Aviation and Missile Lifecycle and Management Command (AMCOM) and the
U.S. Army TACOM Life Cycle Management Command (TACOM), but did not
include the Army's Communication - Electronics Command (CECOM) because
the information system used to manage secondary inventory was not able
to provide item-specific data for the period of our review.
[3] GAO, Contingency Contracting: DOD, State, and USAID Continue to
Face Challenges in Tracking Contractor Personnel and Contracts in Iraq
and Afghanistan, [hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-10-
1] (Washington, D.C.: Oct. 1, 2009).
[4] GAO, Contract Management: DOD Developed Draft Guidance for
Operational Contract Support but Has Not Met All Legislative
Requirements, [hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-09-
114R] (Washington, D.C.: Nov. 20, 2008).
[5] GAO, Defense Acquisitions: Fundamental Changes Are Needed to
Improve Weapon Program Outcomes, [hyperlink, http://www.gao.gov/cgi-
bin/getrpt?GAO-08-1159T] (Washington, D.C.: Sept. 25, 2008) and GAO, A
Knowledge-Based Funding Approach Could Improve Major Weapon System
Program Outcomes, [hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-08-
619] (Washington, D.C.: July 2, 2008).
[6] GAO, Defense Business Transformation: A Full-time Chief Management
Officer with a Term Appointment Is Needed at DOD to Maintain Continuity
of Effort and Achieve Sustainable Success, [hyperlink,
http://www.gao.gov/cgi-bin/getrpt?GAO-08-132T] (Washington, D.C.: Oct,
16, 2007).
GAO's Mission:
The Government Accountability Office, the audit, evaluation and
investigative arm of Congress, exists to support Congress in meeting
its constitutional responsibilities and to help improve the performance
and accountability of the federal government for the American people.
GAO examines the use of public funds; evaluates federal programs and
policies; and provides analyses, recommendations, and other assistance
to help Congress make informed oversight, policy, and funding
decisions. GAO's commitment to good government is reflected in its core
values of accountability, integrity, and reliability.
Obtaining Copies of GAO Reports and Testimony:
The fastest and easiest way to obtain copies of GAO documents at no
cost is through GAO's Web site [hyperlink, http://www.gao.gov]. Each
weekday, GAO posts newly released reports, testimony, and
correspondence on its Web site. To have GAO e-mail you a list of newly
posted products every afternoon, go to [hyperlink, http://www.gao.gov]
and select "E-mail Updates."
Order by Phone:
The price of each GAO publication reflects GAO‘s actual cost of
production and distribution and depends on the number of pages in the
publication and whether the publication is printed in color or black and
white. Pricing and ordering information is posted on GAO‘s Web site,
[hyperlink, http://www.gao.gov/ordering.htm].
Place orders by calling (202) 512-6000, toll free (866) 801-7077, or
TDD (202) 512-2537.
Orders may be paid for using American Express, Discover Card,
MasterCard, Visa, check, or money order. Call for additional
information.
To Report Fraud, Waste, and Abuse in Federal Programs:
Contact:
Web site: [hyperlink, http://www.gao.gov/fraudnet/fraudnet.htm]:
E-mail: fraudnet@gao.gov:
Automated answering system: (800) 424-5454 or (202) 512-7470:
Congressional Relations:
Ralph Dawn, Managing Director, dawnr@gao.gov:
(202) 512-4400:
U.S. Government Accountability Office:
441 G Street NW, Room 7125:
Washington, D.C. 20548:
Public Affairs:
Chuck Young, Managing Director, youngc1@gao.gov:
(202) 512-4800:
U.S. Government Accountability Office:
441 G Street NW, Room 7149:
Washington, D.C. 20548: