Nuclear Waste

DOE Expenditures on The Yucca Mountain Project Gao ID: T-RCED-91-37 April 18, 1991

GAO discussed the Department of Energy's (DOE) use of appropriated funds for completing a scientific investigation needed to obtain a Nuclear Regulatory Commission (NRC) license to construct and operate a nuclear waste repository site at Yucca Mountain, Nevada. GAO noted that: (1) DOE was not ready to begin on-site investigations, originally scheduled for 1987, until 1991 because it took longer than it expected to complete its site investigation plan and NRC compliance program; (2) Nevada did not issue essential environmental permits that DOE needed before it could start the investigation; (3) prior to 1987, DOE spent about $48 million on drilling holes and obtaining core samples, but due to technical and management problems, the samples' usefulness was unclear; (4) from 1989 to 1990, DOE spent $12 million on developing a new drilling technology and core management facility to use in on-site investigation; (5) DOE spent over $36 million in 1988 and 1989 on the design of an exploratory shaft facility before selecting a new facility design and construction plan due to external criticism of its original plan; (6) it was unclear as to how much of the original design work DOE will have to redo or the additional costs that it will incur due to the new plan; and (7) DOE and its contractors spent about $122 million, or 25 percent of total project costs, on general management of the Yucca Mountain project over a 3-year period.



The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.