Under the Federal Acquisition Regulation and the Department of Energy's (DOE) acquisition regulations, DOE can reimburse its contractors for reasonable legal costs associated with cases brought against them in such matters as equal opportunity employment, radiation and toxic exposure, personal injury, and wrongful discharge. Such costs are not reimbursable if there is liability related to the contractor's willful misconduct, lack of good faith, or failure to exercise prudent business judgment. In practice, DOE reimburses its contractors for most of the legal costs. From fiscal year 1995 through the third quarter of fiscal year 2001, there have been more than 2,100 cases and DOE has reimbursed its contractors more than $290 million for associated litigation and disposition costs. The contractors have spent $13 million in their defense. In the same time period, there have been nearly 400 equal employment opportunity cases for which DOE reimbursed its contractors $53 million. The contractors spent $2 million.



GAO-02-418R, Department of Energy: Contractor Litigation Costs This is the accessible text file for GAO report number GAO-02-418R entitled 'Department of Energy: Contractor Litigation Costs' which was released on March 8, 2002. This text file was formatted by the U.S. General Accounting Office (GAO) to be accessible to users with visual impairments, as part of a longer term project to improve GAO products' accessibility. Every attempt has been made to maintain the structural and data integrity of the original printed product. Accessibility features, such as text descriptions of tables, consecutively numbered footnotes placed at the end of the file, and the text of agency comment letters, are provided but may not exactly duplicate the presentation or format of the printed version. The portable document format (PDF) file is an exact electronic replica of the printed version. We welcome your feedback. Please E-mail your comments regarding the contents or accessibility features of this document to Webmaster@gao.gov. This is a work of the U.S. government and is not subject to copyright protection in the United States. It may be reproduced and distributed in its entirety without further permission from GAO. Because this work may contain copyrighted images or other material, permission from the copyright holder may be necessary if you wish to reproduce this material separately. GAO-02-418R: United States General Accounting Office: Washington, DC 20548: March 8, 2002: The Honorable Jim Gibbons: House of Representatives: Subject: Department of Energy: Contractor Litigation Costs: The Department of Energy (DOE) contracts with not-for-profit universities and private companies to operate its facilities. As part of the cost of operating these facilities, DOE can reimburse its contractors for the legal costs associated with cases brought against them. These cases involve such matters as equal employment opportunity, radiation and/or toxic exposure, personal injury, and wrongful discharge. In a letter dated May 26, 1998, you expressed concern that the federal government might be subsidizing contractors that violate the law. Specifically, you asked us to (1) determine what laws and regulations provide for DOE to reimburse its contractors for the litigation, settlement, and judgment costs in cases brought against them; and (2) provide information on such cases, particularly those involving equal employment opportunity, as to the number of cases and the costs that DOE reimbursed its contractors and that contractors paid themselves. On January 28, 2002, we briefed your staff on information related to the legal basis for DOE‘s reimbursement of contractor litigation costs and the number of, cost associated with, and disposition of contractor litigation cases. At that time, your staff requested that we transmit this information to you. In summary, the Federal Acquisition Regulation”which governs acquisitions by all federal executive agencies”and DOE acquisition regulations”which supplement the Federal Acquisition Regulation” provide for the Department to reimburse its contractors for reasonable legal costs. (See enclosure I.) Such costs are not reimbursable if there is liability related to the contractor‘s willful misconduct, lack of good faith, or failure to exercise prudent business judgment. In practice, DOE reimburses its contractors for most of the legal costs. From fiscal year 1995 through the third quarter of fiscal year 2001, there have been more than 2,100 cases involving various types of complaints against DOE contractors and the Department has reimbursed its contractors more than $290 million for litigation and disposition (settlement and judgment) costs associated with these cases. (See enclosures II through XI.) Conversely, the contractors have spent about $13 million in their defense. In the same time period, there have been nearly 400 equal employment opportunity cases for which DOE reimbursed its contractors about $53 million while the contractors spent about $2 million. The information presented in enclosures II through XI was developed from data we obtained from the DOE system used to track contractor litigation costs. We did not independently verify the accuracy of the data contained in this DOE system. We discussed the data presented in this report with the DOE official responsible for that system who attested to the data‘s accuracy. We performed our work from August 2001 through February 2002 in accordance with generally accepted government auditing standards. As arranged with your office, unless you release its contents earlier, we plan no further distribution of this letter until 30 days after its issuance date. At that time, we will send copies to interested parties. This letter will also be available on GAO‘s home page at [hyperlink, http://www.gao.gov]. If you or your staff have any questions regarding this letter, please contact me at (202) 512-3841 or William Fenzel at (202) 512-3156. Sincerely yours, Signed by: (Ms.) Gary L. Jones: Director, Natural Resources and Environment: Enclosures - 11: [End of section] Enclosure I: Legal Basis for DOE Paying Litigation, Settlement, and Judgment Costs for Cases against Its Contractors: Federal Acquisition Regulation (48 C.F.R. 31.205-47) and DOE regulations (48 C.F.R. 970.5228-1) provide for the reimbursement of reasonable legal costs. DOE has issued guidelines on what legal costs are reasonable. Legal costs include attorney fees and other litigation costs, and costs of settlements and judgments. These costs are not reimbursable if there is liability caused by the contractor‘s willful misconduct, lack of good faith, or failure to exercise prudent business judgment. DOE has defined ’prudent business judgment“ as acting in the same manner as a prudent person in the conduct of a competitive business. ’Willful misconduct“ and ’lack of good faith“ are determined on a case-by-case basis by DOE. [End of section] Enclosure II: Number and Type of Contractor Cases (FY 1995 through third quarter of FY 2001): Type[A]: Equal employment opportunity; Number of cases closed, FY 1995: 34; Number of cases closed, FY 1996: 67; Number of cases closed, FY 1997: 56; Number of cases closed, FY 1998: 58; Number of cases closed, FY 1999: 62; Number of cases closed, FY 2000: 44; Number of cases closed, FY 2001: 20; Ongoing: 40; Total: 381. Type[A]: Radiation and/or toxic exposure; Number of cases closed, FY 1995: 4; Number of cases closed, FY 1996: 3; Number of cases closed, FY 1997: 1; Number of cases closed, FY 1998: 1; Number of cases closed, FY 1999: 3; Number of cases closed, FY 2000: 0; Number of cases closed, FY 2001: 28; Ongoing: 11; Total: 51. Type[A]: Personal injury[B]; Number of cases closed, FY 1995: 23; Number of cases closed, FY 1996: 16; Number of cases closed, FY 1997: 18; Number of cases closed, FY 1998: 21; Number of cases closed, FY 1999: 19; Number of cases closed, FY 2000: 18; Number of cases closed, FY 2001: 12; Ongoing: 27; Total: 154. Type[A]: Wrongful discharge; Number of cases closed, FY 1995: 9; Number of cases closed, FY 1996: 16; Number of cases closed, FY 1997: 18; Number of cases closed, FY 1998: 10; Number of cases closed, FY 1999: 8; Number of cases closed, FY 2000: 10; Number of cases closed, FY 2001: 8; Ongoing: 7; Total: 86. Type[A]: Whistle-blower; Number of cases closed, FY 1995: 8; Number of cases closed, FY 1996: 17; Number of cases closed, FY 1997: 16; Number of cases closed, FY 1998: 17; Number of cases closed, FY 1999: 16; Number of cases closed, FY 2000: 23; Number of cases closed, FY 2001: 12; Ongoing: 20; Total: 129. Type[A]: Worker compensation[B]; Number of cases closed, FY 1995: 12; Number of cases closed, FY 1996: 65; Number of cases closed, FY 1997: 72; Number of cases closed, FY 1998: 100; Number of cases closed, FY 1999: 87; Number of cases closed, FY 2000: 100; Number of cases closed, FY 2001: 46; Ongoing: 186; Total: 668. Type[A]: Other[C]; Number of cases closed, FY 1995: 56; Number of cases closed, FY 1996: 59; Number of cases closed, FY 1997: 92; Number of cases closed, FY 1998: 79; Number of cases closed, FY 1999: 94; Number of cases closed, FY 2000: 70; Number of cases closed, FY 2001: 44; Ongoing: 153; Total: 647. Total: Number of cases closed, FY 1995: 146; Number of cases closed, FY 1996: 243; Number of cases closed, FY 1997: 273; Number of cases closed, FY 1998: 286; Number of cases closed, FY 1999: 289; Number of cases closed, FY 2000: 265; Number of cases closed, FY 2001: 170; Ongoing: 444; Total: 2,116. [A] Some cases involved more than one legal issue but have been categorized according to the primary basis for the case as listed in DOE‘s contractor litigation tracking system. [B] Worker compensation involves an employee who has suffered an injury on the job whereas personal injury may or may not involve an employee who may or may not have suffered an injury on the job. [C] This includes various types of cases such as breach of contract and Resource Conservation and Recovery Act cases. Source: Developed by GAO based on DOE data. [End of section] Enclosure III: Disposition of Contractor Cases (FY 1995 through third quarter of FY 2001): FY closed: 1995; Number of cases, Dismissed: 59; Number of cases, Settlement reached: 74; Number of cases, Judgment: 13; Number of cases, Total: 146. FY closed: 1996; Number of cases, Dismissed: 94; Number of cases, Settlement reached: 119; Number of cases, Judgment: 30; Number of cases, Total: 243. FY closed: 1997; Number of cases, Dismissed: 104; Number of cases, Settlement reached: 151; Number of cases, Judgment: 18; Number of cases, Total: 273. FY closed: 1998; Number of cases, Dismissed: 118; Number of cases, Settlement reached: 149; Number of cases, Judgment: 19; Number of cases, Total: 286. FY closed: 1999[A]; Number of cases, Dismissed: 113; Number of cases, Settlement reached: 147; Number of cases, Judgment: 27; Number of cases, Total: 289. FY closed: 2000[A]; Number of cases, Dismissed: 96; Number of cases, Settlement reached: 143; Number of cases, Judgment: 25; Number of cases, Total: 265. FY closed: 2001; Number of cases, Dismissed: 77; Number of cases, Settlement reached: 85; Number of cases, Judgment: 8; Number of cases, Total: 170. Total: Number of cases, Dismissed: 661; Number of cases, Settlement reached: 868; Number of cases, Judgment: 140; Number of cases, Total: 1,672[B]. [A] Fiscal year 1999 had two cases that were closed, but no final dispositions were identified. Fiscal year 2000 had one such case. [B] This total does not include 444 cases that are still ongoing. Source: Developed by GAO based on DOE data. [End of section] Enclosure IV: Disposition of Contractor Cases Involving Equal Employment Opportunity (FY 1995 through third quarter of FY 2001): FY closed: 1995; Number of cases, Dismissed: 14; Number of cases, Settlement reached: 17; Number of cases, Judgment: 3; Number of cases, Total: 34. FY closed: 1996; Number of cases, Dismissed: 26; Number of cases, Settlement reached: 33; Number of cases, Judgment: 8; Number of cases, Total: 67. FY closed: 1997; Number of cases, Dismissed: 28; Number of cases, Settlement reached: 21; Number of cases, Judgment: 7; Number of cases, Total: 56. FY closed: 1998; Number of cases, Dismissed: 28; Number of cases, Settlement reached: 25; Number of cases, Judgment: 5; Number of cases, Total: 58. FY closed: 1999; Number of cases, Dismissed: 29; Number of cases, Settlement reached: 27; Number of cases, Judgment: 6; Number of cases, Total: 62. FY closed: 2000[A]; Number of cases, Dismissed: 15; Number of cases, Settlement reached: 22; Number of cases, Judgment: 6; Number of cases, Total: 44. FY closed: 2001; Number of cases, Dismissed: 6; Number of cases, Settlement reached: 10; Number of cases, Judgment: 4; Number of cases, Total: 20. Total: Number of cases, Dismissed: 146; Number of cases, Settlement reached: 155; Number of cases, Judgment: 39; Number of cases, Total: 341[B]. [A] Fiscal year 2000 had one case that was closed, but no final disposition was identified. [B] This total does not include 40 cases that are still ongoing. Source: Developed by GAO based on DOE data. [End of section] Enclosure V: Cost of Contractor Cases Reimbursed by DOE (FY 1995 through third quarter of FY 2001): Litigation costs on open cases: $105,877,877; Litigation costs on closed cases: $66,673,583; Disposition costs on closed cases: $119,398,592; Total: $291,950,052. Source: Developed by GAO based on DOE data. [End of section] Enclosure VI: Cost of Contractor Cases Paid for by the Contractor (FY 1995 through third quarter of FY 2001): Litigation costs on open cases: $1,855,807; Litigation costs on closed cases: $9,359,142; Disposition costs on closed cases: $1,738,509; Total: $12,953,458. Source: Developed by GAO based on DOE data. [End of section] Enclosure VII: Cost of Contractor Cases Involving Equal Employment Opportunity Reimbursed by DOE (FY 1995 through third quarter of FY 2001): Litigation costs on open cases: $24,206,953; Litigation costs on closed cases: $18,761,018; Disposition costs on closed cases: $10,098,475; Total: $53,066,446. Source: Developed by GAO based on DOE data. [End of section] Enclosure VIII: Cost of Contractor Cases Involving Equal Employment Opportunity Paid for by the Contractor (FY 1995 through third quarter of FY 2001): Litigation costs on open cases: 0; Litigation costs on closed cases: $1,534,893; Disposition costs on closed cases: $552,009; Total: $2,086,902. Source: Developed by GAO based on DOE data. [End of section] Enclosure IX: Examples of Large DOE Reimbursed Judgment Costs on Closed Contractor Cases[A]: Case: HAMTC/Jurisdictional v. BHI; Category: Labor relations; DOE reimbursed litigation costs: $97,698; DOE reimbursed judgment costs: $1,225,000; Total DOE reimbursed costs: $1,322,698. Case: Trumpp Bros v. SLAC; Category: Bankruptcy; DOE reimbursed litigation costs: $0; DOE reimbursed judgment costs: $462,204; Total DOE reimbursed costs: $462,204. Case: Grant-Apollo v. ICF KH & FDNW; Category: Contract – other; DOE reimbursed litigation costs: $348,108; DOE reimbursed judgment costs: $402,343; Total DOE reimbursed costs: $750,451. Case: Bott V. Rockwell; Category: Whistleblower; DOE reimbursed litigation costs: $69,232; DOE reimbursed judgment costs: $309,077; Total DOE reimbursed costs: $378,309. Case: Cousins Construction v. MK-FERGUSON; Category: Contract – other; DOE reimbursed litigation costs: $19,703; DOE reimbursed judgment costs: $252,061; Total DOE reimbursed costs: $271,764. Bradley, W.T. v. Wausau Insurance Companies; Category: Worker compensation DOE reimbursed litigation costs: $0; DOE reimbursed judgment costs: $124,787; Total DOE reimbursed costs: $124,787. [A] The costs shown are for fiscal year 1995 through the third quarter of fiscal year 2001. Some of the cases listed may also have had pre- fiscal year 1995 costs, which are not included in the totals above. Source: Developed by GAO based on DOE data. [End of section] Enclosure X: Examples of Large DOE Reimbursed Settlement Costs on Closed Contractor Cases[A]: Case: Day ET AL. v. NLO, INC., ET AL.; Category: Tort – radiation and/or toxic exposure; DOE reimbursed litigation costs: $1,971,871; DOE reimbursed settlement costs: $20,000,000; Total DOE reimbursed costs: $21,971,871. Case: Green V. MK-F; Category: Breach of contract; DOE reimbursed litigation costs: $874,764; DOE reimbursed settlement costs: $13,379,869; Total DOE reimbursed costs: $14,254,633. Case: Martinez, Gloria v. UC Regents, Williams And McCorkle; Category: Personal injury or liability/wrongful death; DOE reimbursed litigation costs: $415,861; DOE reimbursed settlement costs: $13,000,000; Total DOE reimbursed costs: $13,415,861. Case: OCAW v. MMES (Consolidated); Category: Labor relations; DOE reimbursed litigation costs: $161,594; DOE reimbursed settlement costs: $4,350,000; Total DOE reimbursed costs: $4,511,594. Case: LMES (1) v. Ruth Johnson, Commissioner; Category: Tax; DOE reimbursed litigation costs: $0; DOE reimbursed settlement costs: $3,632,737; Total DOE reimbursed costs: $3,632,737. Case: Optima Chemicals v. WSRC; Category: Contract – other; DOE reimbursed litigation costs: $43,930; DOE reimbursed settlement costs: $3,532,946; Total DOE reimbursed costs: $3,576,876. Case: Hathaway V. Sandia; Category: Contract – other; DOE reimbursed litigation costs: $52,593; DOE reimbursed settlement costs: $3,400,000; Total DOE reimbursed costs: $3,452,593. Case: Anderson (Sgt) v. Wackenhut Services; Category: Fair Labor Standards Act; DOE reimbursed litigation costs: $58,508; DOE reimbursed settlement costs: $3,024,398; Total DOE reimbursed costs: $3,082,906. [A] The costs shown are for fiscal year 1995 through the third quarter of fiscal year 2001. Some of the cases listed may also have had pre- fiscal year 1995 costs, which are not included in the totals above except for Day ET AL. Source: Developed by GAO based on DOE data. [End of section] Enclosure XI: Examples of Large DOE Reimbursed Litigation Costs on Open Contractor Cases[A]: Case: Cook v. Rockwell & Dow; Category: Class action; DOE reimbursed litigation costs: $25,564,478; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $25,564,478. Case: Dupont – Hanford Class Action. Category: Class action; DOE reimbursed litigation costs: $19,217,728; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $19,217,728. Case: Lott v. WSRC Equal Employment; Category: Opportunity – Discrimination; DOE reimbursed litigation costs: $17,085,157; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $17,085,157. Case: Lmitco v. Lmaes And Lockheed Martin Corporation; Category: Contract – other; DOE reimbursed litigation costs: $8,641,830; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $8,641,830. Case: Smith & Wray v. LMES, ET AL.; Category: Tort – radiation and/or toxic exposure; DOE reimbursed litigation costs: $4,843,262; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $4,843,262. Case: Meacham ET AL. v. Kapl ET AL.; Category: Equal Employment Opportunity – Discrimination; DOE reimbursed litigation costs: $2,800,205; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $2,800,205. Case: Boggs, Teresa, Et Al. v. Goodyear, Et Al.; Category: Tort – radiation and/or toxic exposure; DOE reimbursed litigation costs: $1,894,961; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $1,894,961. Case: Rainer (1), ET AL. v. UCC, ET AL.; Category: Tort – radiation and/or toxic exposure; DOE reimbursed litigation costs: $1,771,320; DOE reimbursed disposition costs: $0; Total DOE reimbursed costs: $1,771,320. [A] The costs shown are for fiscal year 1995 through the third quarter of fiscal year 2001. Some of the cases listed may also have had pre- fiscal year 1995 costs, which are not included in the totals above. Source: Developed by GAO based on DOE data. [End of section] GAO‘s Mission: The General Accounting Office, the investigative arm of Congress, exists to support Congress in meeting its constitutional responsibilities and to help improve the performance and accountability of the federal government for the American people. GAO examines the use of public funds; evaluates federal programs and policies; and provides analyses, recommendations, and other assistance to help Congress make informed oversight, policy, and funding decisions. GAO‘s commitment to good government is reflected in its core values of accountability, integrity, and reliability. Obtaining Copies of GAO Reports and Testimony: The fastest and easiest way to obtain copies of GAO documents at no cost is through the Internet. GAO‘s Web site [hyperlink, http://www.gao.gov] contains abstracts and full text files of current reports and testimony and an expanding archive of older products. The Web site features a search engine to help you locate documents using key words and phrases. You can print these documents in their entirety, including charts and other graphics. Each day, GAO issues a list of newly released reports, testimony, and correspondence. GAO posts this list, known as ’Today‘s Reports,“ on its Web site daily. The list contains links to the full-text document files. To have GAO e-mail this list to you every afternoon, go to [hyperlink, http://www.gao.gov] and select ’Subscribe to daily E-mail alert for newly released products“ under the GAO Reports heading. Order by Mail or Phone: The first copy of each printed report is free. Additional copies are $2 each. A check or money order should be made out to the Superintendent of Documents. GAO also accepts VISA and Mastercard. Orders for 100 or more copies mailed to a single address are discounted 25 percent. Orders should be sent to: U.S. General Accounting Office: 441 G Street NW, Room LM: Washington, D.C. 20548: To order by Phone: Voice: (202) 512-6000: TDD: (202) 512-2537: Fax: (202) 512-6061: To Report Fraud, Waste, and Abuse in Federal Programs Contact: Web site: [hyperlink, http://www.gao.gov/fraudnet/fraudnet.htm]: E-mail: fraudnet@gao.gov: Automated answering system: (800) 424-5454 or (202) 512-7470: Public Affairs: Jeff Nelligan, managing director, NelliganJ@gao.gov: (202) 512-4800: U.S. General Accounting Office: 441 G Street NW, Room 7149: Washington, D.C. 20548:

The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.