Issues and Management Problems in Developing an Improved Air-Traffic-Control System

Gao ID: PSAD-77-13 December 15, 1976

The Federal Aviation Administration (FAA) engineering and development program management was examined with an emphasis on the Upgraded Third Generation System, a computer-based semiautomated system intended for en route control centers and airport terminals.

By the end of 1975, over $149 million had been spent on this system, and $564 million was spent and was planned for the next decade. Detailed studies and analyses which would provide information to assess the program's potential have not been completed. Among the unresolved issues are: whether programs to develop the system are designed in response to accident conditions and causes, whether programs to develop the system are cost effective, and whether the government should go forward with the Third Generation program. FAA development plans are often untimely; they lack information needed for program appraisal; they do not use savings techniques such as life-cycle-costing and design-to-cost goals; and they do not adequately describe integration of the various components into the existing system. FAA does not have effective management control throughout development.

Recommendations

Our recommendations from this work are listed below with a Contact for more information. Status will change from "In process" to "Open," "Closed - implemented," or "Closed - not implemented" based on our follow up work.

Director: No director on record Team: No team on record Phone: No phone on record


The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.