FAA Appropriation Issues

Gao ID: T-RCED-88-35 April 12, 1988

GAO discussed Federal Aviation Administration (FAA) appropriations issues, specifically: (1) the work of the FAA systems engineering and integration contractor (SEIC); (2) how much air traffic control (ATC) modernization could cost; (3) when FAA would complete modernization; and (4) how many controller and maintenance technicians FAA would need. GAO found that: (1) although SEIC contributed to the National Airspace System (NAS) plan, its control over the system design was limited; (2) SEIC employees are currently in an improper employee-employer relationship with FAA; (3) FAA assigned SEIC the site-specific design work at air traffic control centers, but SEIC believed that the work was beyond the scope of its responsibility and had difficulty in meeting delivery schedules; (4) SEIC identified changes in the NAS plan that could raise modernization costs from $15.8 billion to $24 billion by the year 2000; and (5) FAA did not have sufficient technical support, controller, or maintenance work forces to implement transition to the future system. GAO believes that a redefined NAS plan would enhance future implementation decisions and permit resetting priorities due to the significant increase in projected funding needs.



The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.