Multibillion Dollar Construction Grant Program

Are Controls Over Federal Funds Adequate? Gao ID: CED-77-113 September 12, 1977

Although the Environmental Protection Agency (EPA) is providing billions of dollars in grants each year to build publicly owned wastewater treatment facilities, Congress does not have assurance that these are properly planned, designed, and constructed. Grantees, usually municipalities contributing from 5 percent to 25 percent of project funding, are expected to provide such assurance. However, they generally rely on consulting engineers to develop accurate, complete, and cost effective designs. They rely also on the engineer and construction contractor to assure that construction complies with detailed plans and specifications.

Because EPA lacks criteria on federal funding of aesthetic features in waste treatment plants, plants have been constructed with a wide variety of architectural features ranging from relatively austere buildings to plants with elaborate and costly aesthetic features. Of 24 operational waste treatment plants reviewed, five could not meet design criteria because of design deficiencies. Seventeen of the 48 projects reviewed experienced delays, increased costs, and inferior workmanship as a result of ineffective controls during the construction phase. If properly enforced, recently promulgated EPA regulations that establish criteria for determining whether a contractor is responsible should help to assure selection of qualified contractors.

Recommendations

Our recommendations from this work are listed below with a Contact for more information. Status will change from "In process" to "Open," "Closed - implemented," or "Closed - not implemented" based on our follow up work.

Director: Team: Phone:


The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.