Nuclear Waste

Issues Affecting Land Withdrawal of DOE's Waste Isolation Pilot Project Gao ID: T-RCED-91-38 April 16, 1991

GAO discussed the Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). GAO noted that: (1) by fiscal year (FY) 1997, DOE plans to determine whether WIPP meets the Environmental Protection Agency's (EPA) standards for disposal of transuranic waste in repositories and plans to obtain a variance or exception from the Resource Conservation and Recovery Act (RCRA); (2) DOE postponed plans to demonstrate large-scale waste handling and storage operations until after it determines that WIPP will comply with EPA standards; (3) DOE issued a test plan that reduced the proposed amount of waste to about 1 percent of facility capacity, but it could not determine the exact quantity of waste to be stored until after the compliance determination; and (4) DOE issued a plan describing the decisionmaking process it would follow in deciding where to store the wastes if retrieval became necessary. GAO believes that: (1) DOE needed to demonstrate to EPA that the hazardous wastes would not migrate beyond the WIPP boundary for as long as they remain hazardous to obtain an RCRA exception; (2) the nature and significance of WIPP storage issues warranted congressional input and direction, rather than administrative action; and (3) DOE should address storage issues now before it needs to retrieve and store it elsewhere.



The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.