Before Licensing Floating Nuclear Power Plants, Many Answers Are Needed

Gao ID: EMD-78-36 September 13, 1978

The predecessor to the Nuclear Regulatory Commission (NRC) received an application in 1973 to manufacture eight standardized floating nuclear power plants near Jacksonville, Florida, and received a separate application in 1974 to station two of the eight plants off the New Jersey coast. Because the floating plants will be built at a location other than where they will be operated, NRC issued new regulations requiring a license for the manufacture of the plants. Approximately $300 million has been spent by the applicants on activities related to the applications, and the first application is more than 3 years behind its original licensing schedule.

NRC staff has made several management decisions that have complicated and contributed to the 3-year delay in its review of the application to manufacture floating nuclear power plants. Factors inhibiting the licensing review process incude: (1) preparation of a generic environmental statement which adds little to the licensing process; (2) NRC failure to evaluate siting possibilities in a timely manner; and (3) NRC failure to evaluate a reactor core melt in a timely manner. The following questions concerning floating nuclear power plants remain: (1) whether more information needed on the risks of a core-melt accident; (2) whether the site will meet requirements for a floating nuclear plant; (3) whether the weight of the plant represent a problem; (4) whether methods been developed for the handling and recovery of nuclear fuel and radioactive waste; (5) whether a method has been developed for decommissioning the floating plant; and (6) whether a floating plant will minimize the environmental effect of power plant operation.

Recommendations

Our recommendations from this work are listed below with a Contact for more information. Status will change from "In process" to "Open," "Closed - implemented," or "Closed - not implemented" based on our follow up work.

Director: No director on record Team: No team on record Phone: No phone on record


The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.