Many cost analyses project further increases in the cost of nuclear powerplants, based in part on lengthening construction times. It is important that government data accurately reflect the current actual construction times and trends in order to provide a correct basis for these analyses.

The "Construction Status Report" (NUREG), the official document on the status of nuclear construction, indicates a continued lengthening of nuclear construction times beyond the 102 months averaged in 1978. A GAO analysis of nuclear powerplant construction progress over the past 24 months indicates that the rate of nuclear plant construction, instead of slowing, has stabilized. The precise extent of this overstatement of constuction time is difficult to determine. NUREG measures construction duration from a point called mobilization, which occurs prior to site preparation and commencement of structural construction, to fuel load date. At sites with more than one plant, the start of mobilization and site preparation is usually the same for all plants, even though the plants are not scheduled to reach their fuel load dates simultaneously. The construction is deliberately staggered, but the NUREG format does not take this into account in estimating construction time. Thus the apparent lengthening observed in nuclear powerplant construction durations estimated by NUREG is much larger than is actually the case. GAO adjusted the NUREG estimate of construction duration through 1978 by correcting for overstatement for multiple plants; the GAO trend indicates lower construction times and a stabilization in construction at around 90 months.

Recommendations

Our recommendations from this work are listed below with a Contact for more information. Status will change from "In process" to "Open," "Closed - implemented," or "Closed - not implemented" based on our follow up work.

Director: No director on record Team: No team on record Phone: No phone on record


The Justia Government Accountability Office site republishes public reports retrieved from the U.S. GAO These reports should not be considered official, and do not necessarily reflect the views of Justia.