Information Technology
VA and DOD Face Challenges in Completing Key Efforts
Gao ID: GAO-06-905T June 22, 2006
The Department of Veterans Affairs (VA) is engaged in an ongoing effort to share electronic medical information with the Department of Defense (DOD), which is important in helping to ensure high-quality health care for active duty military personnel and veterans. Also important, in the face of current military responses to national and foreign crises, is ensuring effective and efficient delivery of veterans' benefits, which is the focus of VA's development of the Veterans Service Network (VETSNET), a modernized system to support benefits payment processes. GAO is testifying on (1) VA's efforts to exchange medical information with DOD, including both near-term initiatives involving existing systems and the longer term program to exchange data between the departments' new health information systems, and (2) VA's ongoing project to develop VETSNET. To develop this testimony, GAO relied on its previous work and followed up on agency actions to respond to GAO recommendations.
VA and DOD are implementing near-term demonstration projects that exchange limited electronic medical information between their existing systems, and they are making progress in their longer term effort to share information between the new health information systems that each is developing. Two demonstration projects have been implemented at selected sites: (1) a project to achieve the two-way exchange of health information on patients who receive care from both departments and (2) an application to electronically transfer laboratory work orders and results. According to VA and DOD, these projects have enabled lower costs and improved service to patients by saving time and avoiding errors. In their longer term effort, VA and DOD have made progress, in response to earlier GAO recommendations, by designating a lead entity with final decision-making authority and establishing a project management structure. However, VA and DOD have not yet developed a clearly defined project management plan that gives a detailed description of the technical and managerial processes necessary to satisfy project requirements, as GAO previously recommended. Moreover, the departments have experienced delays in their efforts to begin exchanging patient health data; they have not yet fully populated the repositories that will store the data for their future health systems. As a result, much work remains to be done before the departments achieve their ultimate goal of sharing virtual medical records. VA has also been working to modernize the delivery of benefits through its development of VETSNET, but the pace of progress has been discouraging. Originally initiated in 1986, this program was prompted by the need to modernize VA's Benefits Delivery Network--parts of which are now 40-year-old technology--on which the department relies to make benefits payments, including compensation and pension, education, and vocational rehabilitation and employment. In 1996, after experiencing numerous false starts and spending approximately $300 million, VBA revised its strategy and narrowed its focus to modernizing the compensation and pension system. In earlier reviews, GAO has made numerous recommendations to improve the program's management, including the development of an integrated project plan. In response to GAO's recommendations as well as those of an independent evaluator, VA is now developing an integrated master plan for the compensation and pension system, which it intends to complete in August. Until VA addresses the managerial and program weaknesses that have hampered the program, it is uncertain when VA will be able to end its reliance on its aging benefits technology.
GAO-06-905T, Information Technology: VA and DOD Face Challenges in Completing Key Efforts
This is the accessible text file for GAO report number GAO-06-905T
entitled 'Information Technology: VA and DOD Face Challenges in
Completing Key Efforts' which was released on June 23, 2006.
This text file was formatted by the U.S. Government Accountability
Office (GAO) to be accessible to users with visual impairments, as part
of a longer term project to improve GAO products' accessibility. Every
attempt has been made to maintain the structural and data integrity of
the original printed product. Accessibility features, such as text
descriptions of tables, consecutively numbered footnotes placed at the
end of the file, and the text of agency comment letters, are provided
but may not exactly duplicate the presentation or format of the printed
version. The portable document format (PDF) file is an exact electronic
replica of the printed version. We welcome your feedback. Please E-mail
your comments regarding the contents or accessibility features of this
document to Webmaster@gao.gov.
This is a work of the U.S. government and is not subject to copyright
protection in the United States. It may be reproduced and distributed
in its entirety without further permission from GAO. Because this work
may contain copyrighted images or other material, permission from the
copyright holder may be necessary if you wish to reproduce this
material separately.
United States Government Accountability Office:
GAO:
Testimony:
Before the Subcommittee on Federal Financial Management, Government
Information, and International Security, Committee on Homeland Security
and Governmental Affairs, U.S. Senate:
For Release on Delivery:
Expected at 2:30 p.m. EDT Thursday, June 22, 2006:
Information Technology:
VA and DOD Face Challenges in Completing Key Efforts:
Statement of Linda D. Koontz, Director:
Information Management Issues:
GAO-06-905T:
GAO Highlights:
Highlights of GAO-06-905T, a testimony before the Subcommittee on
Federal Financial Management, Government Information, and International
Security, Committee on Homeland Security and Governmental Affairs, U.S.
Senate.
Why GAO Did This Study:
The Department of Veterans Affairs (VA) is engaged in an ongoing effort
to share electronic medical information with the Department of Defense
(DOD), which is important in helping to ensure high-quality health care
for active duty military personnel and veterans. Also important, in the
face of current military responses to national and foreign crises, is
ensuring effective and efficient delivery of veterans‘ benefits, which
is the focus of VA‘s development of the Veterans Service Network
(VETSNET), a modernized system to support benefits payment processes.
GAO is testifying on (1) VA‘s efforts to exchange medical information
with DOD, including both near-term initiatives involving existing
systems and the longer term program to exchange data between the
departments‘ new health information systems, and (2) VA‘s ongoing
project to develop VETSNET.
To develop this testimony, GAO relied on its previous work and followed
up on agency actions to respond to GAO recommendations.
What GAO Found:
VA and DOD are implementing near-term demonstration projects that
exchange limited electronic medical information between their existing
systems, and they are making progress in their longer term effort to
share information between the new health information systems that each
is developing. Two demonstration projects have been implemented at
selected sites: (1) a project to achieve the two-way exchange of health
information on patients who receive care from both departments and (2)
an application to electronically transfer laboratory work orders and
results. According to VA and DOD, these projects have enabled lower
costs and improved service to patients by saving time and avoiding
errors. In their longer term effort, VA and DOD have made progress, in
response to earlier GAO recommendations, by designating a lead entity
with final decision-making authority and establishing a project
management structure. However, VA and DOD have not yet developed a
clearly defined project management plan that gives a detailed
description of the technical and managerial processes necessary to
satisfy project requirements, as GAO previously recommended. Moreover,
the departments have experienced delays in their efforts to begin
exchanging patient health data;
they have not yet fully populated the repositories that will store the
data for their future health systems. As a result, much work remains to
be done before the departments achieve their ultimate goal of sharing
virtual medical records.
VA has also been working to modernize the delivery of benefits through
its development of VETSNET, but the pace of progress has been
discouraging. Originally initiated in 1986, this program was prompted
by the need to modernize VA‘s Benefits Delivery Network”parts of which
are now 40-year-old technology”on which the department relies to make
benefits payments, including compensation and pension, education, and
vocational rehabilitation and employment. In 1996, after experiencing
numerous false starts and spending approximately $300 million, VBA
revised its strategy and narrowed its focus to modernizing the
compensation and pension system. In earlier reviews, GAO has made
numerous recommendations to improve the program‘s management, including
the development of an integrated project plan. In response to GAO‘s
recommendations as well as those of an independent evaluator, VA is now
developing an integrated master plan for the compensation and pension
system, which it intends to complete in August. Until VA addresses the
managerial and program weaknesses that have hampered the program, it is
uncertain when VA will be able to end its reliance on its aging
benefits technology.
What GAO Recommends:
GAO has previously made numerous recommendations on these topics,
including that VA and DOD develop an integrated project plan to guide
their efforts to share patient health data, and that VA develop an
integrated project plan for VETSNET.
[Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-06-905T].
To view the full product, including the scope and methodology, click on
the link above. For more information, contact Linda Koontz at (202) 512-
6240 or koontzl@gao.gov.
[End of Section]
Mr. Chairman and Members of the Subcommittee:
I am pleased to participate in today's hearing on health information
technology. As you know, the Departments of Veterans Affairs (VA) and
Defense (DOD) are engaged in efforts to share electronic medical
information, which is important in helping to ensure that active duty
military personnel and veterans receive high-quality health care. Also
important, in the face of current military responses to national and
foreign crises, is ensuring effective and efficient delivery of
veterans' benefits, which is the focus of VA's development of the
Veterans Service Network (VETSNET), a modernized system to support
benefits payment processes.
For the past 8 years, VA and DOD have been working to develop the
ability to exchange patient health information electronically. As part
of their efforts, each department is developing its own modern health
information system--VA's HealtheVet VistA and DOD's Armed Forces Health
Longitudinal Technology Application (AHLTA),[Footnote 1] and they are
collaborating on a program to develop an interface to enable these
future systems to share data and ultimately to have
interoperable[Footnote 2] electronic medical records with computable
data. That is, the data would be in a format that a computer
application can act on: for example, to provide alerts to clinicians
(of such things as drug allergies) or to plot graphs of changes in
vital signs such as blood pressure. According to the departments, the
availability of computable medical data contributes significantly to
patient safety and the usefulness of electronic medical records.
In addition, responding to a congressional mandate,[Footnote 3] VA and
DOD initiated information technology demonstration projects in 2004
that focus on near-term goals: the exchange of electronic medical
information between the departments' existing health information
systems. These projects are to help in the evaluation of the
feasibility, advantages, and disadvantages of measures to improve
sharing and coordination of health care and health care resources. The
two demonstration projects (Bidirectional Health Information Exchange
and Laboratory Data Sharing Interface) are limited, interim initiatives
that are separate from the departments' ongoing long-term efforts in
sharing data and developing health information systems.
Another ongoing VA project is the development of VETSNET, which was
prompted by the need to modernize VA's Benefits Delivery Network, parts
of which are now 40-year-old technology. This project, which was
originally initiated in 1986, is essential to ensure the continued
accurate processing of benefits payments.
At your request, my testimony today will summarize our previous work
and describe agency actions to respond to our recommendations in two
areas.
* First, I will discuss VA's continued efforts to exchange medical
information with DOD, including (1) near-term initiatives to exchange
data between the agencies' existing systems and (2) progress in
achieving the longer term goal of exchanging data between the
departments' new systems, to be built around electronic patient health
records.
* Second, I will discuss VA's ongoing project to modernize its Benefits
Delivery Network and develop VETSNET.
To describe the current status of VA and DOD efforts to exchange
medical information, we reviewed our previous work in this area,
analyzed VA and DOD documentation to determine the implementation
status of our open recommendations, and consulted with VA and DOD
officials responsible for key decisions and actions on the health data-
sharing initiatives. To describe VA's efforts on the VETSNET
initiative, we reviewed our previous work in this area, analyzed
documentation to determine the implementation status of our open
recommendations--most specifically, the Carnegie Mellon Software
Engineering Institute's Technical Assessment of the VETSNET project--
and consulted with the Veterans Benefits Administration officials
responsible for key decisions and actions on the project. The costs
that has been incurred for the various projects were provided by
cognizant VA and DOD officials. We did not audit the reported costs and
thus cannot attest to their accuracy or completeness. All work on which
this testimony is based was conducted in accordance with generally
accepted government auditing standards.
Results in Brief:
VA and DOD are implementing limited, near-term demonstration projects,
and they are making progress toward their long-term effort to share
electronic patient health data. The two demonstration projects, which
have been implemented at selected sites, have provided significant
benefits, according to the two departments, because they enable lower
costs and improved service to patients by saving time and avoiding
errors:
* Bidirectional Health Information Exchange, implemented at 16 sites,
allows the two-way exchange of health information on shared
patients[Footnote 4] in text format (including outpatient pharmacy
data, drug and food allergy information, patient demographics,
radiology results, and laboratory results[Footnote 5]).
* The Laboratory Data Sharing Interface application, implemented at 6
sites, is used to facilitate the electronic transfer/sharing of orders
for laboratory work and the results of the work.
In their longer term efforts to achieve a virtual medical record, VA
and DOD have more to do to achieve the two-way electronic data exchange
capability originally envisioned. They have made progress in, for
example, preparing data for exchange, and they have implemented three
of our four earlier recommendations (for example, they have developed
an architecture for the electronic interface between DOD's Clinical
Data Repository and VA's Health Data Repository).[Footnote 6] However,
they have not yet developed a clearly defined project management plan
that gives a detailed description of the technical and managerial
processes necessary to satisfy project requirements, as we recommended.
Moreover, the departments have experienced delays in their efforts to
begin exchanging computable patient health data. The departments now
expect that by the end of this month their joint facility in El Paso
will begin to share computable outpatient pharmacy and medication
allergy data, which will be able to support drug interaction checking
and drug-allergy alerts.
As our and others' assessments of the VETSNET project over the years
have determined, the development and implementation of this project
have been hampered by inadequate project management and immature
software development capabilities. VETSNET was originally intended to
replace the aging Benefits Delivery Network, which makes about 3.5
million payments to veterans each month, including compensation and
pension benefits, education benefits, and vocational rehabilitation and
employment benefits. In 1996 the Veterans Benefits Administration (VBA)
changed its focus to modernizing only the compensation and pension
payment system. In our past reviews of the modernization project, we
made a number of recommendations aimed at improving VBA's software
development capabilities and program management, including that the
agency establish an integrated project plan to guide its transition
from the old to the new system. Although VBA took steps to respond to
our recommendations, it did not establish an integrated project plan.
In 2005, after postponing the target date for completion numerous
times, VBA contracted for an independent assessment of its VETSNET
program. This assessment concluded that the risks to the program arose
not from technical issues, but from management and organizational
issues like those that we had previously described. VBA reports that it
is now developing a new integrated project plan for the compensation
and pension payment system that is to include realistic milestones.
According to VBA, only after this plan is completed will it begin
developing plans for modernizing the systems for education benefits and
for vocational rehabilitation and employment benefits. Similarly, VBA
has not yet developed plans for making the transition to VETSNET and
ending dependence on the Benefits Delivery Network. Without plans to
move from the current to the replacement system, VBA will lack
assurance that it can continue to pay beneficiaries accurately and on
time through the transition period.
Background:
VA's mission is to promote the health, welfare, and dignity of all
veterans in recognition of their service to the nation by ensuring that
they receive medical care, benefits, social support, and lasting
memorials. The information technology programs that I will be
discussing today are primary concerns of two of VA's major
components:[Footnote 7] the Veterans Health Administration, which
manages one of the largest health care systems in the United States,
with 157 hospitals nationwide, and the Veterans Benefits
Administration, which provides benefits and services to veterans and
their dependents that include compensation and pension, education, loan
guaranty, and insurance.
VA and DOD Have Been Working on Electronic Medical Records Since 1998:
In 1998, following a presidential call for VA and DOD to start
developing a "comprehensive, life-long medical record for each service
member," the two departments began a joint course of action aimed at
achieving the capability to share patient health information for active
duty military personnel and veterans.[Footnote 8] Their first
initiative, undertaken in that year, was known as the Government
Computer-Based Patient Record (GCPR) project;
the goal of this project was an electronic interface that would allow
physicians and other authorized users at VA and DOD health facilities
to access data from any of the other agency's health information
systems. The interface was expected to compile requested patient
information in a virtual record that could be displayed on a user's
computer screen.
In our reviews of the GCPR project, we determined that the lack of a
lead entity, clear mission, and detailed planning to achieve that
mission made it difficult to monitor progress, identify project risks,
and develop appropriate contingency plans. In April 2001 and in June
2002,[Footnote 9] we made recommendations to help strengthen the
management and oversight of the project. In 2001, we recommended that
the participating agencies (1) designate a lead entity with final
decision-making authority and establish a clear line of authority for
the GCPR project and (2) create comprehensive and coordinated plans
that included an agreed-upon mission and clear goals, objectives, and
performance measures, to ensure that the agencies could share
comprehensive, meaningful, accurate, and secure patient health care
data. In 2002, we recommended that the participating agencies revise
the original goals and objectives of the project to align with their
current strategy, commit the executive support necessary to adequately
manage the project, and ensure that it followed sound project
management principles.
VA and DOD took specific measures in response to our recommendations
for enhancing overall management and accountability of the project. By
July 2002, VA and DOD had revised their strategy and had made progress
toward being able to electronically share patient health data. The two
departments had refocused the project and named it the Federal Health
Information Exchange (FHIE) program and, consistent with our prior
recommendation, had finalized a memorandum of agreement designating VA
as the lead entity for implementing the program. This agreement also
established FHIE as a joint activity that would allow the transfer from
DOD to VA of health care information in two phases:
* The first phase, completed in mid-July 2002, enabled the one-way
transfer of data from DOD's existing health information system (the
Composite Health Care System or CHCS) to a separate database that VA
clinicians could access.
* A second phase, finalized in March 2004, completed VA's and DOD's
efforts to add to the base of patient health information available to
VA clinicians via this one-way sharing capability.
According to the December 2004 VA/DOD Joint Executive Council[Footnote
10] Annual Report, FHIE was fully operational, and providers at all VA
medical centers and clinics nationwide had access to data on separated
service members. According to the report, the FHIE data repository at
that time contained historical clinical health data on 2.3 million
unique patients from 1989 on, and the repository made a significant
contribution to the delivery and continuity of care and adjudication of
disability claims of separated service members as they transitioned to
veteran status. The departments reported total GCPR/FHIE costs of about
$85 million through fiscal year 2003.
In addition, officials stated that in December 2004, the departments
began to plan for using the FHIE framework to transfer pre-and
postdeployment health assessment data from DOD to VA. According to
these officials, transferring of this information began in July 2005,
and VA has now received about 1.3 million of these records on more than
560,000 separated service members.
However, not all DOD medical information is captured in CHCS. For
example, according to DOD officials, as of September 2005, 1.7 million
patient stay records were stored in the Clinical Information System (a
commercial product customized for DOD). In addition, many Air Force
facilities use a system called the Integrated Clinical Database for
their medical information.
The revised DOD/VA strategy also envisioned achieving a longer term,
two-way exchange of health information between DOD and VA, which may
also address systems outside of CHCS. Known as HealthePeople (Federal),
this initiative is premised on the departments' development of a common
health information architecture comprising standardized data,
communications, security, and high-performance health information
systems. The joint effort is expected to result in the secured sharing
of health data between the new systems that each department is
currently developing and beginning to implement--DOD's AHLTA and VA's
HealtheVet VistA.
* DOD began developing AHLTA in 1997.[Footnote 11] DOD has completed a
key component for the planned electronic interface--its Clinical Data
Repository, and it expects to complete deployment of all of its major
system capabilities by 2011.[Footnote 12] (When we reported in June
2004, this deployment was expected in September 2008.) DOD expects to
spend about $783 million for the system through fiscal year
2006.[Footnote 13]
* VA began work on HealtheVet VistA and its associated Health Data
Repository in 2001 and expected to complete all six initiatives
comprising this system in 2012. VA reported spending about $514 million
on initiatives that comprise HealtheVet VistA through fiscal year
2005.[Footnote 14]
Under the HealthePeople (Federal) initiative, VA and DOD envision that,
on entering military service, a health record for the service member
would be created and stored in DOD's Clinical Data Repository. The
record would be updated as the service member receives medical care.
When the individual separated from active duty and, if eligible, sought
medical care at a VA facility, VA would then create a medical record
for the individual, which would be stored in its Health Data
Repository. On viewing the medical record, the VA clinician would be
alerted and provided with access to the individual's clinical
information residing in DOD's repository. In the same manner, when a
veteran sought medical care at a military treatment facility, the
attending DOD clinician would be alerted and provided with access to
the health information in VA's repository. According to the
departments, this planned approach would make virtual medical records
displaying all available patient health information from the two
repositories accessible to both departments' clinicians.
To achieve this goal requires the departments to be able to exchange
computable health information between the data repositories for their
future health systems: that is, VA's Health Data Repository (a
component of HealtheVet VistA) and DOD's Clinical Data Repository (a
component of AHLTA). In March 2004, the departments began an effort to
develop an interface linking these two repositories, known as CHDR (a
name derived from the abbreviations for DOD's Clinical Data Repository-
-CDR--and VA's Health Data Repository--HDR). According to the
departments,[Footnote 15] they planned to be able to exchange selected
health information through CHDR by October 2005. However, by September
2005, this deadline had slipped to February 2006 (and now to the end of
June).
Developing the two repositories, populating them with data, and linking
them through the CHDR interface would be important steps toward the two
departments' long-term goals as envisioned in HealthePeople (Federal).
Achieving these goals would then depend on completing the development
and deployment of the associated health information systems--HealtheVet
VistA and AHLTA.
In a review of the CHDR program in June 2004,[Footnote 16] we reported
that the efforts of DOD and VA in this area demonstrated a number of
management weaknesses. Among these were the lack of a well-defined
architecture for describing the interface for a common health
information exchange;
an established project management lead entity and structure to guide
the investment in the interface and its implementation;
and a project management plan defining the technical and managerial
processes necessary to satisfy project requirements. With these
critical components missing, VA and DOD increased the risk that they
would not achieve their goals. Accordingly, we recommended that the
departments:
* develop an architecture for the electronic interface between their
health systems that includes system requirements, design
specifications, and software descriptions;
* select a lead entity with final decision-making authority for the
initiative;
* establish a project management structure to provide day-to-day
guidance of and accountability for their investments in and
implementation of the interface capability;
and:
* create and implement a comprehensive and coordinated project
management plan for the electronic interface that defines the technical
and managerial processes necessary to satisfy project requirements and
includes (1) the authority and responsibility of each organizational
unit; (2) a work breakdown structure for all of the tasks to be
performed in developing, testing, and implementing the software, along
with schedules associated with the tasks;
and (3) a security policy.
In September 2005, we testified that VA and DOD had made progress in
the electronic sharing of patient health data in their near-term
demonstration projects. We noted that with regard to their long-term
goals, the departments had improved the management of the CHDR program,
but that this program continued to face significant challenges--in
particular, developing a project management plan of sufficient
specificity to be an effective guide for the program.[Footnote 17]
Besides pursuing their long-term goals for future systems through the
HealthePeople (Federal) strategy, the departments are working on two
demonstration projects that focus on exchanging information between
existing systems: (1) Bidirectional Health Information Exchange, a
project to exchange health information on shared patients, and (2)
Laboratory Data Sharing Interface, an application used to transfer
laboratory work orders and results. These demonstration projects were
planned in response to provisions of the Bob Stump National Defense
Authorization Act of 2003, which mandated that VA and DOD conduct
demonstration projects that included medical information and
information technology systems to be used as a test for evaluating the
feasibility, advantages, and disadvantages of measures and programs
designed to improve the sharing and coordination of health care and
health care resources between the departments.
Figure 1 is a time line showing initiation points for the VA and DOD
efforts discussed here, including strategies, major programs, and the
recent demonstration projects.
Figure 1: History of Selected VA/DOD Electronic Medical Records and
Data Sharing Efforts:
[See PDF for image]
[End of figure]
Work on VETSNET Dates to 1986:
The VETSNET effort grew out of an initiative begun by the Veterans
Benefits Administration (VBA) in 1986 to replace its outdated Benefits
Delivery Network. The Benefits Delivery Network, parts of which were
developed in the 1960s, contains over 3 million veterans benefits
records, including compensation and pension, education, and vocational
rehabilitation and employment. Originally, the plan was to modernize
all of these systems and in so doing provide a rich source for
answering questions about veterans' benefits and enable faster
processing of benefits. As envisioned in the 1980s, the modernization
would produce a faster, more flexible, higher capacity system that
would be both an information system and a payment system. In 1996,
after experiencing numerous false starts and spending approximately
$300 million on the overall modernization of BDN, VBA revised its
strategy and narrowed its focus to modernizing the compensation and
pension payment system.
At that time, we undertook an assessment of the department's software
development capability[Footnote 18] and determined that it was
immature. In our assessment, we specifically examined the VETSNET
effort and concluded that VBA could not reliably develop and maintain
high-quality software on any major project within existing cost and
schedule constraints. VBA showed significant weaknesses in requirements
management, software project planning, and software subcontract
management, with no identifiable strengths. We also testified that (1)
VBA did not follow sound systems development practices on VETSNET, such
as validation and verification of systems requirements;
(2) it employed for the project a new systems development methodology
and software development language not previously used;
and (3) it did not develop the cost-benefit information necessary to
track progress or assess return on investment (for example, total
software to be developed and cost estimates).[Footnote 19] As a result,
we concluded that VBA's modernization efforts had inherent risks.
Between 1996 and 2002 we reported several more times on VETSNET,
highlighting concerns in several areas. (See attachment 1 for a
description of the conclusions and findings of our products on this
topic.) In these products, we made several recommendations aimed at
improving VA's software development capabilities, including that the
department take steps to achieve greater maturity in its software
development processes[Footnote 20] and that it delay any major
investment in software development (beyond that needed to sustain
critical day-to-day operations) until it had done so. In addition, we
made recommendations aimed specifically at VETSNET development,
including that VBA assess and validate users' requirements for the new
system; complete testing of the system's functional business
capability, as well as end-to-end testing to ensure that payments are
made accurately; and establish an integrated project plan to guide its
transition from the old to the new system.
Although VBA took various actions in response to these recommendations,
we continued to identify the department's weak software development
capability as a significant factor contributing to VBA's persistent
problems in developing and implementing the system--the same condition
that we identified in 1996. We also reported that VBA continued to work
on VETSNET without an integrated project plan. As a result, the
development of VETSNET continued to suffer from problems in several
areas, including project management, requirements development, and
testing.
VA and DOD Are Working to Share Medical Information:
VA and DOD have made progress in sharing patient health data by
implementing applications developed under two demonstration projects
that focus on the exchange of electronic medical information. The
first--the Bidirectional Health Information Exchange--has been
implemented at 16 VA/DOD locations, and the second--Laboratory Data
Sharing Interface--has been implemented at 6 VA/DOD locations.
Bidirectional Health Information Exchange. According to a VA/DOD annual
report and program officials, Bidirectional Health Information Exchange
(BHIE) is an interim step in the departments' overall strategy to
create a two-way exchange of electronic medical records. BHIE builds on
the architecture and framework of FHIE, the application used to
transfer health data on separated service members from DOD to VA. As
discussed earlier, FHIE provides an interface between VA's and DOD's
existing health information systems that allows one-way transfers only,
which do not occur in real time: VA clinicians do not have access to
transferred information until about 6 weeks after separation. In
contrast, BHIE focuses on the two-way, near-real-time[Footnote 21]
exchange of information (text only) on shared patients (such as those
at sites jointly occupied by VA and DOD facilities). This application
exchanges data between VA's VistA system and DOD's CHCS system (and
AHLTA where implemented). As of September 2005, the departments
reported having spent $2.6 million on BHIE.[Footnote 22]
The primary benefit of BHIE is near-real-time access to patient medical
information for both VA and DOD, which is not available through FHIE.
During a site visit to a VA and DOD location in Puget Sound in 2005, we
viewed a demonstration of this capability and were told by a VA
clinician that the near-real-time access to medical information was
very beneficial in treating shared patients.
As of June 2006, BHIE was deployed at VA and DOD facilities at 16
sites, where the exchange of demographic, outpatient pharmacy,
radiology, laboratory, and allergy data (text only) has been achieved.
In addition, according to officials, over 120 outpatient military
clinics associated with these sites also have access to this
information through BHIE. According to VA and DOD, BHIE will be
implemented at two more sites in July 2006.[Footnote 23] Table 1
presents a schedule for implementation of BHIE; the sites listed are
all DOD sites with nearby VA facilities.
Table 1: Implementation of BHIE at Selected DOD Facilities:
Facility: Madigan Army Medical Center, Fort Lewis, Puget Sound, Wash;
Implementation date: October 2004.
Facility: William Beaumont Army Medical Center, El Paso, Tex;
Implementation date: October 2004.
Facility: Eisenhower Army Medical Center, Fort Gordon, Ga;
Implementation date: September 2005.
Facility: Naval Hospital Great Lakes, Great Lakes, Ill;
Implementation date: September 2005.
Facility: Naval Medical Center, San Diego, Calif;
Implementation date: September 2005.
Facility: National Naval Medical Center, Bethesda, Md;
Implementation date: November 2005.
Facility: Walter Reed Army Medical Center, Washington, D.C;
Implementation date: November 2005.
Facility: Malcolm Grow Medical Center, Andrews Air Force Base, Md;
Implementation date: November 2005.
Facility: Mike O'Callaghan Federal Hospital, Nellis Air Force Base,
Nev;
Implementation date: November 2005.
Facility: Landstuhl Regional Medical Center, Landstuhl, Germany;
Implementation date: March 2006.
Facility: Tripler Army Medical Center, Honolulu, Hawaii;
Implementation date: April 2006.
Facility: Womack Army Medical Center, Fort Bragg, N.C;
Implementation date: April 2006.
Facility: David Grant Medical Center, Travis Air Force Base, Calif;
Implementation date: April 2006.
Facility: Brooke Army Medical Center, San Antonio, Tex;
Implementation date: May 2006.
Facility: Wilford Hall Medical Center, San Antonio, Tex;
Implementation date: May 2006.
Facility: Bassett Army Community Hospital, Fort Wainwright, Alaska;
Implementation date: May 2006.
Facility: Naval Hospital, Jacksonville, Fla;
Implementation date: Planned for July 2006.
Facility: Naval Hospital, Charleston, S.C;
Implementation date: Planned for July 2006.
Sources: VA and DOD.
Note: VA facilities are sited near all the DOD facilities shown.
[End of table]
Additionally, because DOD stores electronic medical information in
systems other than CHCS (such as the Clinical Information System and
the Integrated Clinical Database), work is currently under way to allow
BHIE to have the ability to exchange information with those systems.
Currently, one site is testing the use of BHIE as an interface allowing
both departments' staff to view discharge summaries stored in the
Clinical Information System.[Footnote 24] DOD and VA plan to perform a
side-by-side comparison to ensure that this capability maintains data
quality. When they are satisfied, the capability will be provided to
those DOD locations that currently use the Clinical Information System
and have BHIE implemented. Doing so will permit all VA sites access to
the information in the Clinical Information System on shared patients
at DOD sites running BHIE.
In addition, at the VA/DOD site in El Paso, a prototype is being
designed for exchanging radiological images using the BHIE/FHIE
infrastructure. If the prototype is successful, this capability will be
extended to the rest of the sites.
Laboratory Data Sharing Interface. The Laboratory Data Sharing
Interface (LDSI) initiative enables the two departments to share
laboratory resources. Through LDSI, a VA provider can use VA's health
information system to write an order for laboratory tests, and that
order is electronically transferred to DOD, which performs the test.
The results of the laboratory tests are electronically transferred back
to VA and included in the patient's medical record. Similarly, a DOD
provider can choose to use a VA lab for testing and receive the results
electronically. Once LDSI is fully implemented at a facility, the only
nonautomated action in performing laboratory tests is the transport of
the specimens.
Among the benefits of LDSI are increased speed in receiving laboratory
results and decreased errors from manual entry of orders. However,
according to the LDSI project manager in San Antonio, a primary benefit
of the project will be the time saved by eliminating the need to rekey
orders at processing labs to input the information into the
laboratories' systems. Additionally, the San Antonio VA facility will
no longer have to contract out some of its laboratory work to private
companies, but instead use the DOD laboratory. As of September 2005,
the departments reported having spent about $3.3 million on
LDSI.[Footnote 25]
An early version of what is now LDSI was originally tested and
implemented at a joint VA and DOD medical facility in Hawaii in May
2003. The demonstration project built on this application and enhanced
it; the resulting application was tested in San Antonio and El Paso. It
has now been deployed to six sites. According to the departments, a
plan to export LDSI to two additional locations has been approved.
Table 2 shows the locations at which it has been or is to be
implemented.
Table 2: Implementation of LDSI at VA/DOD Facilities:
Facility: Tripler Army Medical Center and VA Spark M. Matsunaga Medical
Center, Hawaii;
Implementation date: May 2003.
Facility: Kirtland Air Force Base and Albuquerque VA Medical Center,
N.Mex.[A];
Implementation date: May 2003.
Facility: Naval Medical Center and San Diego VA Health Care System,
Calif;
Implementation date: July 2004.
Facility: Great Lakes Naval Hospital and VA Medical Center, Ill;
Implementation date: October 2004.
Facility: William Beaumont Army Medical Center, El Paso, Tex;
Implementation date: October 2004.
Facility: Brooke Army Medical Center, San Antonio, Tex;
Implementation date: August 2005.
Facility: Bassett Army Community Hospital, Alaska;
Implementation date: Planned for June 2006.
Facility: Nellis Air Force Base, Nev;
Implementation date: Planned for September 2006.
Sources: VA and DOD.
[A] According to officials, although LDSI was implemented at this site,
it is no longer being actively used.
[End of table]
VA and DOD Are Taking Action to Achieve a Virtual Medical Record, but
Much Work Remains:
Besides the near-term initiatives just discussed, VA and DOD continue
their efforts on the longer term goal: to achieve a virtual medical
record based on the two-way exchange of computable data between the
health information systems that each is currently developing. The
cornerstone for this exchange is CHDR, the planned electronic interface
between the data repositories for the new systems.
The departments have taken important actions on the CHDR initiative. As
we testified in September 2005,[Footnote 26] they successfully
completed Phase I of CHDR in September 2004 by demonstrating the two-
way exchange of pharmacy information with a prototype in a controlled
laboratory environment.[Footnote 27] According to department officials,
the pharmacy prototype provided invaluable insight into each other's
data repository systems, architecture, and the work that is necessary
to support the exchange of computable information. These officials
stated that lessons learned from the development of the prototype were
documented and being applied to Phase II of CHDR, the production phase,
which is to implement the two-way exchange of patient health records
between the departments' data repositories. Further, the same DOD and
VA teams that developed the prototype were developing the production
version.
In addition, the departments developed an architecture for the CHDR
electronic interface, as we recommended in June 2004. The architecture
for CHDR includes major elements required in a complete architecture.
For example, it defines system requirements and allows these to be
traced to the functional requirements, it includes the design and
control specifications for the interface design, and it includes design
descriptions for the software.
Also in response to our recommendations, the departments established
project accountability and implemented a joint project management
structure. Specifically, the Health Executive Council was established
as the lead entity for the project. The joint project management
structure consists of a Program Manager from VA and a Deputy Program
Manager from DOD to provide day-to-day guidance for this initiative.
Additionally, the Health Executive Council established the DOD/VA
Information Management/Information Technology Working Group and the
DOD/VA Health Architecture Interagency Group, to provide programmatic
oversight and to facilitate interagency collaboration on sharing
initiatives between DOD and VA.
To build on these actions and successfully carry out the CHDR
initiative, however, the departments still have a number of challenges
to overcome. The success of CHDR will depend on the departments'
instituting a highly disciplined approach to the project's management.
Industry best practices and information technology project management
principles stress the importance of accountability and sound planning
for any project, particularly an interagency effort of the magnitude
and complexity of this one.
Accordingly, in 2004 we recommended that the departments develop a
clearly defined project management plan that describes the technical
and managerial processes necessary to satisfy project requirements and
includes (1) the authority and responsibility of each organizational
unit; (2) a work breakdown structure for all of the tasks to be
performed in developing, testing, and implementing the software, along
with schedules associated with the tasks; and (3) a security policy. As
of September 2005, the departments had an interagency project
management plan that provided the program management principles and
procedures to be followed by the project. However, this plan did not
specify the authority and responsibility of organizational units for
particular tasks; the work breakdown structure was at a high level and
lacked detail on specific tasks and time frames; and security policy
was still being drafted. No more recent plan has yet been provided.
Without a plan of sufficient detail, VA and DOD increase the risk that
the CHDR project will not deliver the planned capabilities in the time
and at the cost expected.
In addition, officials did not meet a previously established milestone:
by October 2005, the departments had planned to be able to exchange
outpatient pharmacy data, laboratory results, allergy information, and
patient demographic information on a limited basis. However, according
to officials, the work required to implement standards for pharmacy and
medication allergy data was more complex than originally anticipated
and would result in a delay. The new target date for the limited
exchange of medication allergy, outpatient pharmacy, and patient
demographic data has been postponed from February to June 2006.
Currently, the departments report that they are close to finishing the
development of a pilot to perform this data exchange at their joint
facility in El Paso. They expect to be able to begin the pilot by the
end of this month, which will allow them to share outpatient pharmacy
and medication allergy information that can support drug-drug
interaction checking and drug-allergy alerts. If the pilot is
successful, it will enable for the first time the exchange of
computable information between the departments' two data repositories.
Finally, the health information currently in the data repositories has
various limitations.
* Although DOD's Clinical Data Repository includes data in the
categories that were to be exchanged at the missed milestone described
above (outpatient pharmacy data, laboratory results, allergy
information, and patient demographic information), these data are not
yet complete. First, the information in the Clinical Data Repository is
limited to those locations that have implemented the first increment of
AHLTA, DOD's new health information system. As of June 15, 2006,
according to DOD officials, 115 of 138 medical treatment facilities
worldwide have implemented this increment, and officials expect that
the remaining facilities will receive the increment by the end of this
year. Second, at present, health information in systems other than CHCS
(such as the Clinical Information System and the Integrated Clinical
Database) is not yet being captured in the Clinical Data Repository.
However, work is currently under way to allow BHIE to have the ability
to exchange information with those systems.
* The information in VA's Health Data Repository is also limited:
although all VA medical records are currently electronic, VA has to
convert these into the interoperable format appropriate for the Health
Data Repository. So far, the data in the Health Data Repository consist
of patient demographics, vital signs records, allergy data, and
outpatient pharmacy data for the 6 million veterans who have electronic
medical records in VA's current system, VistA (this system contains all
the department's medical records in electronic form). VA officials told
us that they are currently converting lab results data.
VA Has Been Severely Challenged by VETSNET Project:
Since its inception, the VETSNET program has been plagued by problems.
In 2002, we offered a number of recommendations regarding the ongoing
compensation and pension (C&P) replacement program. We testified that
VBA should assess and validate users' requirements for the new system
and complete testing of the system's functional business capability,
including end-to-end testing.[Footnote 28] We also recommended that VA
appoint a project manager, thoroughly analyze its current initiative,
and develop a number of plans, including a revised C&P replacement
strategy and an integrated project plan. We also noted that VBA had
much work to do before it could fully implement the VETSNET C&P system
by its target date (at that time) of 2005, and thus it would have to
ensure that the aging Benefits Delivery Network (BDN) would be
available to continue accurately processing benefits payments until a
new system could be deployed. Accordingly, we recommended that VBA
develop action plans to move from the current to the replacement system
and to ensure the availability of BDN to provide the more than 3.5
million payments made to veterans each month.[Footnote 29]
VA concurred with our recommendations and took several actions to
address them. For example, it appointed a full-time project manager.
Also, the project team reported that to ensure that business needs were
met, certification had been completed of users' requirements for the
system's applications.
In addition, VA reported that a revised strategy for the replacement
system was completed. This revised strategy included the business case,
described the methodology used to identify system development
alternatives, displayed the cost/benefit analysis results of the viable
alternatives that could be used to develop the system, and provided a
description of the recommended development plan. Based on this
strategy, the Secretary of Veterans Affairs, Assistant Secretary for
Information and Technology, the Under Secretary for Benefits, and the
Deputy Chief Information Officer for Benefits approved continuation of
the VETSNET development in September 2002.
Further, to ensure that the benefits delivery network would be able to
continue accurately processing benefits payment until the new system
was deployed, VBA purchased additional BDN hardware, hired 11 new staff
members to support BDN operations, successfully tested a contingency
plan in the event of disruption of the system, and provided retention
bonuses to staff familiar with BDN operations.
However, VBA did not develop an integrated project plan for VETSNET,
which is a basic requirement of sound project management. In addition,
it did not develop an action plan for transitioning from the current to
the replacement system. Thus, although the actions taken addressed some
of our specific concerns, they were not sufficient to establish the
program on a sound footing.
In 2005, the VA CIO became concerned by continuing problems with
VETSNET: the project continued to postpone target dates, and costs
continued to increase (VA indicated that by 2005 these costs exceeded
$69 million). Accordingly, he arranged to contract for an independent
assessment of the department's options for the VETSNET project,
including an evaluation of whether the program should be terminated.
This assessment, conducted by the Carnegie Mellon Software Engineering
Institute (SEI), concluded that the program faced many risks arising
from management, organizational, and program issues, but no technical
barriers that could not be overcome.[Footnote 30] According to SEI,
terminating the program would not solve the underlying management and
organizational problems, which would continue to hamper any new or
revised effort.
SEI recommended that the department not terminate the program but take
an aggressive approach to dealing with the issues SEI described while
continuing to work on the program at a reduced pace. According to SEI,
this approach would allow VA to make necessary improvements to its
system and software engineering and program management capabilities
while making gradual progress on the system. SEI also discussed
specific concerns about the system's management and the organization's
capabilities, presenting areas that required focus regardless of the
particular course that VA chose for the system. For example:
* Setting realistic deadlines. SEI commented that there was no credible
evidence that VETSNET would be complete by the target date, which at
the time of the SEI review was December 2006. Because this deadline was
unrealistic, VBA needed to plan and budget for supporting BDN so that
its ability to pay veterans benefits would not be disrupted.
* Establishing an effective requirements process.
* Implementing effective program measurements in order to assess
progress.
* Establishing sound program management. According to SEI, different
organizational components had independent schedules and priorities,
which caused confusion and deprived the department of a program
perspective.
These observations are consistent with our long-standing concerns
regarding fundamental deficiencies in VBA's management of the project.
In the wake of the SEI assessment and recommendations, VA is in the
process of creating, with contract help, an integrated master plan that
is to cover the C&P replacement project. Because this plan is in
process, no cost or schedule milestones have yet been finalized.
According to VA, the integrated master plan is to be completed by the
end of August 2006.
VA officials told us that they intend to complete this plan before
beginning to plan for modernizing the systems for paying education
benefits or for paying vocational rehabilitation and employment
benefits. Plans for making the transition to VETSNET and ending VBA's
dependence on BDN are also on hold.
Thus, VA still lacks an integrated project plan or a plan to move from
the current to the replacement system. Until it has an integrated
project plan and schedule incorporating all the critical areas of the
system development effort, VBA will lack the means of determining what
needs to be done and when, and of measuring progress. Without plans to
move from the current to the replacement system, VBA will lack
assurance that it can continue to pay beneficiaries accurately and on
time through the transition period.
In summary, developing an electronic interface that will enable VA and
DOD to exchange computable patient medical records is a highly complex
undertaking that could lead to substantial benefits--improving the
quality of health care and disability claims processing for the
nation's service members and veterans. VA and DOD have made progress in
the electronic sharing of patient health data in their limited, near-
term demonstration projects, and have taken an important step toward
their long-term goals by improving the management of the CHDR program.
However, the departments face considerable work and significant
challenges before they can achieve these long-term goals. While the
departments have made progress in developing a project management plan,
it is not yet complete. Having a project management plan of sufficient
specificity to guide the program--including establishing accountability
and addressing security--would help the departments avoid further
delays in their schedule and ensure that they produce a capability that
meets their expectations.
VA has also been working to modernize the delivery of benefits through
its development of VETSNET, but the pace of progress has been
discouraging. Much work remains in accomplishing the original
comprehensive goal of modernizing the aging system that VBA currently
depends on to pay veterans benefits. Until VBA develops an integrated
project plan that addresses the long-standing management weaknesses
that we and others have identified, it will be uncertain when and at
what cost VETSNET will be delivered.
Mr. Chairman, this concludes my statement. I would be pleased to
respond to any questions that you or other members of the Subcommittee
may have at this time.
Contacts and Acknowledgments:
For information about this testimony, please contact Linda D. Koontz,
Director, Information Management Issues, at (202) 512-6240 or at
koontzl@gao.gov. Other individuals making key contributions to this
testimony include Barbara S. Collier, Martin Katz, Barbara S. Oliver,
Eric L. Trout, Robert Williams Jr., and Charles Youman.
Attachment 1:
Past GAO Products Highlighting VETSNET Concerns:
We previously performed several reviews addressing VETSNET and made
numerous recommendations aimed at strengthening the program and VA's
software development and management capabilities. The table summarizes
the results of these reviews.
Table 3: GAO Products Highlighting Concerns with VETSNET Project to
Replace Compensation and Pension (C&P) Payment System:
Issuance date Report/testimony: June 19, 1996 GAO/T-AIMD-96-103;
Results of review: VETSNET had inherent risks in that (1) it did not
follow sound systems development practices, such as validation and
verification of systems requirements; (2) it employed a new systems
development methodology and software development language not
previously used; and (3) VBA did not develop the cost-benefit
information necessary to track progress or assess return on investment
(for example, total software to be developed and cost estimates).
Issuance date Report/testimony: June 19, 1996 GAO/AIMD-96-90;
Results of review: VBA's software development capability was immature
and it could not reliably develop and maintain high-quality software on
any major project within existing cost and schedule constraints,
placing its software development projects at significant risk. VBA
showed significant weaknesses in requirements management, software
project planning, and software subcontract management, with no
identifiable strengths.
Issuance date Report/testimony: May 30, 1997 GAO/AIMD-97-79;
Results of review: VETSNET experienced schedule delays and missed
deadlines because (1) it employed a new software development language
not previously used by the development team, one that was inconsistent
with the agency's other systems development efforts; (2) the
department's software development capability was immature and it had
lost critical systems control and quality assurance personnel, and (3)
VBA lacked a complete systems architecture; for example, neither a
security architecture nor performance characteristics had been defined
for the project.
Issuance date Report/testimony: September 15, 1997 GAO/AIMD-97-154;
Results of review: VBA's software development capability remained ad
hoc and chaotic, subjecting the agency to continuing risk of cost
overruns, poor quality software, and schedule delays in software
development.
Issuance date Report/testimony: May 11, 2000 GAO/T-AIMD-00-74;
Results of review: $11 million had reportedly been spent on VETSNET
C&P; neither the May 1998 completion date nor the revised completion
date of December 1998 were met. Contributing factors included lack of
an integrated architecture defining the business processes, information
flows and relationships, business requirements, and data descriptions,
and VBA's immature software development capability.
Issuance date Report/testimony: September 21, 2000 GAO/T-AIMD-00-321;
Results of review: VBA's software development capability remained ad
hoc and chaotic. The VETSNET implementation approach lacked key
elements, including a strategy for data conversion and an integrated
project plan and schedule incorporating all critical systems
development areas. Further, data exchange issues had not been fully
addressed.
Issuance date Report/testimony: April 4, 2001 GAO-01-550T;
Results of review: The project's viability was still a concern. It
continued to lack an integrated project plan and schedule addressing
all critical systems development areas, to be used as a means of
determining what needs to be done and when. A pilot test of 10 original
claims that did not require significant development work may not have
been sufficient to demonstrate that the product was capable of working
as intended in an organizationwide operational setting.
Issuance date Report/testimony: March 13, 2002 GAO-02-369T;
Results of review: VBA still had fundamental tasks to accomplish before
it could successfully complete development and implementation. It still
had to assess and validate users' requirements for the new system to
ensure that business needs were met. It needed to complete testing of
the system's functional business capability, as well as end-to-end
testing to ensure that payments would be made accurately. Finally, it
needed to establish an integrated project plan to guide its transition
from the old to the new system.
Issuance date Report/testimony: June 12, 2002 GAO-02-703;
Results of review: VA still needed to address long-standing concerns
regarding development and implementation. VA needed to appoint a
project manager, undertake a complete analysis of the initiative, and
develop plans, including a revised C&P replacement system strategy and
an integrated project plan. It also needed to develop and implement
action plans to move VBA from the current to the replacement system and
to ensure that the Benefits Delivery Network would be able to continue
accurately processing benefits payments until the new system was
deployed.
Issuance date Report/testimony: September 26, 2002 GAO-02-1054T;
Results of review: Much work remained before VBA could fully implement
the VETSNET C&P system, and complete implementation was not expected
until 2005. This meant that VBA had to continue relying on its aging
Benefits Delivery Network to provide the more than 3.5 million payments
that VA had to make to veterans each month; In late March, a VETSNET
executive board and a project control board were established to provide
decision support and oversee implementation, and VBA expected to hire a
full-time project manager by the end of September. VBA also began
revalidating functional business requirements for the new system, with
completion planned by January 2003, and it identified actions needed to
transition VBA from the current to the replacement system. VBA also
hired a contractor and tasked the contractor with conducting
functional, integration, and linkage testing, as well as software
quality assurance for each release of the system applications;
Despite these actions, completing implementation of the new system
could take several years. All but one of the software applications for
the new system still needed to be fully deployed or developed.
Specifically, a rating board automation tool (RBA 2000) was deployed,
although VBA did not plan to require all its regional offices to use it
until July 2003. In addition, two others had not been completely
deployed: one of these (Share, used to establish a new claim) was in
use by only 6 of the 57 regional offices. The other (Modern Award
Processing-Development, used to develop information on claims) was in
pilot testing at two regional offices--Salt Lake and Little Rock--but
was not expected to be implemented at the other 55 regional offices
until October 2003. The remaining three software applications (Award
Processing, Finance and Accounting System, and Correspondence) were
still in development.
Source: GAO.
[End of table]
Footnotes
[1] In November 2005, DOD gave this name to its future health
information system, previously known as Composite Health Care System
(CHCS) II.
[2] Interoperability is the ability of two or more systems or
components to exchange information and to use the information that has
been exchanged.
[3] The Bob Stump National Defense Authorization Act for Fiscal Year
2003, Pub. L. No. 107-314, §721 (a)(1), 116 Stat. 2589,2595 (2002). To
further encourage on-going collaboration, section 721 directed the
Secretary of Defense and the Secretary of Veterans Affairs to establish
a joint program to identify and provide incentives to implement, fund,
and evaluate creative health care coordination and sharing initiatives
between DOD and VA.
[4] Shared patients receive care from both VA and DOD clinicians. For
example, veterans may receive outpatient care from VA clinicians and be
hospitalized at a military treatment facility.
[5] These data are text files providing surgical, pathology, cytology,
microbiology, chemistry, and hematology test results and descriptions
of radiology results.
[6] The other two implemented recommendations were that they select a
lead entity with final decision-making authority for the initiative and
that they establish a project management structure to provide day-to-
day guidance of and accountability for their investments in and
implementation of the interface capability.
[7] VA's third major component is the National Cemetery Administration,
which is responsible for providing burial benefits to veterans and
eligible dependents.
[8] Initially, the Indian Health Service (IHS) also was a party to this
effort, having been included because of its population-based research
expertise and its long-standing relationship with VA. However, IHS was
not included in a later revised strategy for electronically sharing
patient health information.
[9] GAO, Veterans Affairs: Sustained Management Attention Is Key to
Achieving Information Technology Results, GAO-02-703 ( Washington,
D.C.: June 12, 2002) and Computer-Based Patient Records: Better
Planning and Oversight by VA, DOD, and IHS Would Enhance Health Data
Sharing, GAO-01-459 (Washington, D.C.: Apr. 30, 2001).
[10] The Joint Executive Council is composed of the Deputy Secretary of
Veterans Affairs, the Undersecretary of Defense for Personnel and
Readiness, and the co-chairs of joint councils on health, benefits, and
capital planning. The council meets on a quarterly basis to recommend
strategic direction of joint coordination and sharing efforts.
[11] At that time it was known as CHCS II. In November 2005, DOD
renamed CHCS II the Armed Forces Health Longitudinal Technology
Application (AHLTA).
[12] DOD's AHLTA capabilities are being deployed incrementally. The
first increment provides a graphical user interface for clinical
outpatient processes, thus providing an electronic medical record
capability. According to DOD, the first increment has been deployed to
115 of the 138 DOD health facilities.
[13] These expenditures represent total implementation and start-up
costs and include, among other things, procurement, acquisition
operations, and maintenance used for the development, integration, and
deployment of the system.
[14] The six initiatives that make up HealtheVet VistA are the Health
Data Repository, billing replacement, laboratory, pharmacy, imaging,
and appointment scheduling replacement. This amount includes
investments in these six initiatives by VA as reported in its
submission to the Office of Management and Budget for fiscal year 2005.
[15] December 2004 VA and DOD Joint Strategic Plan.
[16] GAO, Computer-Based Patient Records: VA and DOD Efforts to
Exchange Health Data Could Benefit from Improved Planning and Project
Management, GAO-04-687 (Washington, D.C.: June 7, 2004).
[17] GAO, Computer-Based Patient Records: VA and DOD Made Progress, but
Much Work Remains to Fully Share Medical Information, GAO-05-1051T
(Washington, D.C.: Sept. 28, 2005).
[18] GAO, Software Capability Evaluation: VA's Software Development
Process Is Immature, GAO/AIMD-96-90 (Washington, D.C.: June 19, 1996).
[19] GAO, Veterans Benefits Modernization: Management and Technical
Weaknesses Must Be Overcome If Modernization Is to Succeed, GAO/ T-AIMD-
96-103 (Washington, D.C.: June 19, 1996).
[20] Specifically, at the repeatable level of process maturity, basic
project management processes are established to track cost, schedule,
and functionality, and the necessary process discipline is in place to
repeat earlier successes on projects with similar applications.
[21] Officials reported that on average, response time is less than 30
seconds.
[22] VA reported spending $2.4 million on BHIE through fiscal year
2006. DOD reported spending $63.2 million through fiscal year 2006 for
BHIE, FHIE, LDSI, and CHDR;
it did not provide a breakdown for individual programs.
[23] According to the program manager, implementation of BHIE requires
training of staff from both departments. In addition, implementation at
DOD facilities requires installation of a server;
implementation at VA facilities requires installation of a software
patch (downloaded from a VA computer center), but no additional
equipment.
[24] VA and DOD are planning to initiate the pilot at a second site in
August 2006.
[25] VA reported spending $1 million on LDSI through fiscal year 2006.
DOD reported spending $63.2 million through fiscal year 2006 for BHIE,
FHIE, LDSI, and CHDR;
it did not provide a breakdown for individual programs.
[26] GAO, Computer-Based Patient Records: VA and DOD Made Progress, but
Much Work Remains to Fully Share Medical Information, GAO-05-1051T
(Washington, D.C.: Sept. 28, 2005).
[27] The completion of the pharmacy prototype project satisfied a
mandate of the 2003 Bob Stump National Defense Authorization Act, Pub.
L. 107-314, sec. 724 (2002).
[28] GAO, VA Information Technology: Progress Made, but Continued
Management Attention Is Key to Achieving Results, GAO-02-369T
(Washington, D.C.: Mar. 13, 2002).
[29] GAO, Veterans Affairs: Sustained Management Attention Is Key to
Achieving Information Technology Results, GAO-02-703 (Washington, D.C.:
June 12, 2002).
[30] Kathryn Ambrose, William Novak, Steve Palmquist, Ray Williams, and
Carol Woody, Report of the Independent Technical Assessment on the
Department of Veterans Affairs VETSNET Program (Carnegie Mellon
Software Engineering Institute, September 2005).
GAO's Mission:
The Government Accountability Office, the investigative arm of
Congress, exists to support Congress in meeting its constitutional
responsibilities and to help improve the performance and accountability
of the federal government for the American people. GAO examines the use
of public funds;
evaluates federal programs and policies;
and provides analyses, recommendations, and other assistance to help
Congress make informed oversight, policy, and funding decisions. GAO's
commitment to good government is reflected in its core values of
accountability, integrity, and reliability.
Obtaining Copies of GAO Reports and Testimony:
The fastest and easiest way to obtain copies of GAO documents at no
cost is through the Internet. GAO's Web site ( www.gao.gov ) contains
abstracts and full-text files of current reports and testimony and an
expanding archive of older products. The Web site features a search
engine to help you locate documents using key words and phrases. You
can print these documents in their entirety, including charts and other
graphics.
Each day, GAO issues a list of newly released reports, testimony, and
correspondence. GAO posts this list, known as "Today's Reports," on its
Web site daily. The list contains links to the full-text document
files. To have GAO e-mail this list to you every afternoon, go to
www.gao.gov and select "Subscribe to e-mail alerts" under the "Order
GAO Products" heading.
Order by Mail or Phone:
The first copy of each printed report is free. Additional copies are $2
each. A check or money order should be made out to the Superintendent
of Documents. GAO also accepts VISA and Mastercard. Orders for 100 or
more copies mailed to a single address are discounted 25 percent.
Orders should be sent to:
U.S. Government Accountability Office
441 G Street NW, Room LM
Washington, D.C. 20548:
To order by Phone:
Voice: (202) 512-6000:
TDD: (202) 512-2537:
Fax: (202) 512-6061:
To Report Fraud, Waste, and Abuse in Federal Programs:
Contact:
Web site: www.gao.gov/fraudnet/fraudnet.htm
E-mail: fraudnet@gao.gov
Automated answering system: (800) 424-5454 or (202) 512-7470: